RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0712006368 - Archived data from Tue, 11. August 2020 17:56:38 CEST


This is all the information about APD 0712006368. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0712006368
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C08
Break-through voltage: 411 V
Voltage for Gain 100 (T=+25°C): 382.9 V
Dark current: 15.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 297
Position in Box: 11
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 51
Position in grid: 9
Arrival for irradiation: 03. Aug 2017
Sent for analysis after irradiation: 23. Aug 2017
Return for assembly: none
   
Irradiation:  
Date: 11. Aug 2017
Dose used: 46 Gy
Temperature: 20 °C
Position: 2
Bias voltage: 382.9 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.3777836 V     T = -25 °C: 346.8132632 V
Voltage for Gain 150: T = +20 °C: 390.2688182 V     T = -25 °C: 354.1552672 V
Voltage for Gain 200: T = +20 °C: 394.647274 V     T = -25 °C: 358.286133 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.444669592 V-1     T = -25 °C: 4.99553394 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.637388809 V-1     T = -25 °C: 9.323474906 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.9530103 V-1     T = -25 °C: 14.6573332 V-1
Break-through voltage: T = +20 °C: 410.2716618 V     T = -25 °C: 373.6960363 V
   
Notes:


Version history

Time Author Change comment
11. Jul 2022 14:24:23 CEST oafedulidis Assigned to capsule by script
17. May 2021 09:14:54 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:26:35 CET jreher Updated box and position via API.
11. Aug 2020 17:56:38 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:46:11 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:42:11 CEST jreher Updated APD location via API.
21. Jul 2020 14:42:01 CEST jreher Updated box and position via API.
19. Dec 2019 15:48:07 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:17:28 CET jreher Updated box and position via API.
23. Aug 2017 15:53:42 CEST markus.moritz Entered shipped after irradiation date.
11. Aug 2017 14:10:48 CEST hans-georg.zaunick Entered irradiation information.
07. Aug 2017 16:52:52 CEST hans-georg.zaunick Entered arrival for irradiation date.
07. Aug 2017 16:43:41 CEST hans-georg.zaunick Entered arrival for irradiation date.
04. Aug 2017 03:14:58 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:13:10 CEST Tobias Imported from Hamamatsu datasheet.