RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0712006366 - Archived data from Mon, 17. May 2021 09:17:32 CEST


This is all the information about APD 0712006366. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0712006366
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F08
Break-through voltage: 411 V
Voltage for Gain 100 (T=+25°C): 382.5 V
Dark current: 11.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 297
Position in Box: 9
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 51
Position in grid: 5
Arrival for irradiation: 03. Aug 2017
Sent for analysis after irradiation: 23. Aug 2017
Return for assembly: none
   
Irradiation:  
Date: 11. Aug 2017
Dose used: 46 Gy
Temperature: 20 °C
Position: 2
Bias voltage: 382.5 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.334654 V     T = -25 °C: 346.7606921 V
Voltage for Gain 150: T = +20 °C: 390.214356 V     T = -25 °C: 354.1696898 V
Voltage for Gain 200: T = +20 °C: 394.5915559 V     T = -25 °C: 358.3462001 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.466633527 V-1     T = -25 °C: 4.993808586 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.706717998 V-1     T = -25 °C: 9.231701788 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.16726635 V-1     T = -25 °C: 14.48888574 V-1
Break-through voltage: T = +20 °C: 409.7577489 V     T = -25 °C: 373.7045472 V
   
Notes:


Version history

Time Author Change comment
07. Feb 2022 10:46:08 CET oafedulidis Assigned to capsule by script
17. May 2021 09:17:32 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:26:35 CET jreher Updated box and position via API.
11. Aug 2020 17:56:38 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:46:11 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:42:10 CEST jreher Updated APD location via API.
21. Jul 2020 14:42:01 CEST jreher Updated box and position via API.
19. Dec 2019 15:48:07 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:17:27 CET jreher Updated box and position via API.
23. Aug 2017 15:53:42 CEST markus.moritz Entered shipped after irradiation date.
11. Aug 2017 14:10:48 CEST hans-georg.zaunick Entered irradiation information.
07. Aug 2017 16:52:52 CEST hans-georg.zaunick Entered arrival for irradiation date.
07. Aug 2017 16:43:41 CEST hans-georg.zaunick Entered arrival for irradiation date.
04. Aug 2017 03:14:58 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:13:09 CEST Tobias Imported from Hamamatsu datasheet.