RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1612017712 - Archived data from Tue, 11. August 2020 17:57:20 CEST


This is all the information about APD 1612017712. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1612017712
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F11
Break-through voltage: 423 V
Voltage for Gain 100 (T=+25°C): 394.5 V
Dark current: 6.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 301
Position in Box: 20
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 465
Position in grid: 17
Arrival for irradiation: 30. Oct 2017
Sent for analysis after irradiation: 17. Nov 2017
Return for assembly: none
   
Irradiation:  
Date: 16. Nov 2017
Dose used: 45 Gy
Temperature: 20 °C
Position: 3
Bias voltage: 394.5 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 394.8961628 V     T = -25 °C: 358.2856209 V
Voltage for Gain 150: T = +20 °C: 402.8096307 V     T = -25 °C: 366.0436849 V
Voltage for Gain 200: T = +20 °C: 407.2057203 V     T = -25 °C: 370.3954011 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.587853445 V-1     T = -25 °C: 4.578108283 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.038549752 V-1     T = -25 °C: 8.990348855 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.0285996 V-1     T = -25 °C: 15.66826962 V-1
Break-through voltage: T = +20 °C: 423.1434595 V     T = -25 °C: 386.4368614 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:27:08 CET jreher Updated box and position via API.
11. Aug 2020 17:57:20 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:43:09 CEST jreher Updated APD location via API.
21. Jul 2020 14:43:00 CEST jreher Updated box and position via API.
19. Dec 2019 15:54:11 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:17:58 CET jreher Updated box and position via API.
17. Nov 2017 09:39:50 CET markus.moritz Entered shipped after irradiation date.
17. Nov 2017 09:38:37 CET markus.moritz Entered irradiation information.
09. Nov 2017 15:12:20 CET markus.moritz Entered arrival for irradiation date.
02. Nov 2017 15:16:56 CET Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:45:35 CEST Tobias Imported from Hamamatsu datasheet.