RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0711006329 - Archived data from Fri, 05. February 2021 11:26:00 CET


This is all the information about APD 0711006329. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0711006329
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 0711006329/2415027108
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: C04
Break-through voltage: 414 V
Voltage for Gain 100 (T=+25°C): 385.3 V
Dark current: 16.8 nA
   
Screening Logistics:  
Available: No
Storage Box: 292
Position in Box: 37
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 47
Position in grid: 1
Arrival for irradiation: 20. Jun 2016
Sent for analysis after irradiation: 23. Jun 2016
Return for assembly: 11. Jul 2016
   
Irradiation:  
Date: 21. Jun 2016
Dose used: 37 Gy
Temperature: 25 °C
Position: 1
Bias voltage: 320 V     (connection unknown)
   
Annealing:  
Date: 21. Jun 2016
Temperature: 80 °C
Duration: 8 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 384.6982299 V     T = -25 °C: 349.1629859 V
Voltage for Gain 150: T = +20 °C: 392.6485038 V     T = -25 °C: 356.5788939 V
Voltage for Gain 200: T = +20 °C: 397.0658868 V     T = -25 °C: 360.7375506 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.319242114 V-1     T = -25 °C: 4.829753985 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.168411122 V-1     T = -25 °C: 9.808259159 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.16304497 V-1     T = -25 °C: 15.58214158 V-1
Break-through voltage: T = +20 °C: 412.8665854 V     T = -25 °C: 376.3310158 V
   
Notes:


Version history

Time Author Change comment
17. Apr 2021 01:10:34 CEST jreher Updated APD location via API.
05. Feb 2021 11:26:00 CET jreher Updated box and position via API.
11. Aug 2020 17:40:44 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:41:03 CEST jreher Updated box and position via API.
03. Apr 2020 10:08:43 CEST jreher Assigned to capsule by script
13. Feb 2020 14:24:05 CET jreher Updated box and position via API.
27. Nov 2019 20:19:13 CET jreher Updated APD location via API.
25. Nov 2019 17:31:39 CET jreher Updated box and position via API.
22. Oct 2019 14:33:21 CEST spankonin Updated APD location via API.
15. Oct 2019 11:00:19 CEST jgrochowski Updated APD batch assignment via API.
03. Aug 2016 15:47:15 CEST markus.moritz Entered return for assembly date.
03. Aug 2016 15:46:40 CEST markus.moritz Entered shipped after irradiation date.
03. Aug 2016 15:42:45 CEST markus.moritz Entered arrival for irradiation date.
02. Aug 2016 15:23:35 CEST christopher.l.hahn Entered annealing information.
02. Aug 2016 13:56:42 CEST markus.moritz Entered irradiation information.
01. Aug 2016 17:27:46 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:13:09 CEST Tobias Imported from Hamamatsu datasheet.