RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0711006305 - Archived data from Tue, 11. August 2020 17:56:57 CEST


This is all the information about APD 0711006305. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0711006305
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G08
Break-through voltage: 417 V
Voltage for Gain 100 (T=+25°C): 389.4 V
Dark current: 13.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 299
Position in Box: 4
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 46
Position in grid: 3
Arrival for irradiation: 03. Aug 2017
Sent for analysis after irradiation: 23. Aug 2017
Return for assembly: none
   
Irradiation:  
Date: 11. Aug 2017
Dose used: 46 Gy
Temperature: 20 °C
Position: 1
Bias voltage: 389.4 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 388.9632336 V     T = -25 °C: 352.9946907 V
Voltage for Gain 150: T = +20 °C: 396.798672 V     T = -25 °C: 360.4402138 V
Voltage for Gain 200: T = +20 °C: 401.1407448 V     T = -25 °C: 364.6061856 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.607038388 V-1     T = -25 °C: 4.893737009 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.197974836 V-1     T = -25 °C: 8.949165292 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.34277345 V-1     T = -25 °C: 15.95091372 V-1
Break-through voltage: T = +20 °C: 416.1333946 V     T = -25 °C: 379.6536823 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:26:50 CET jreher Updated box and position via API.
11. Aug 2020 17:56:57 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:42:39 CEST jreher Updated APD location via API.
21. Jul 2020 14:42:29 CEST jreher Updated box and position via API.
19. Dec 2019 15:50:07 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:17:42 CET jreher Updated box and position via API.
23. Aug 2017 15:54:04 CEST markus.moritz Entered shipped after irradiation date.
11. Aug 2017 14:10:09 CEST hans-georg.zaunick Entered irradiation information.
11. Aug 2017 12:58:49 CEST hans-georg.zaunick Entered irradiation information.
07. Aug 2017 16:52:30 CEST hans-georg.zaunick Entered arrival for irradiation date.
07. Aug 2017 16:42:40 CEST hans-georg.zaunick Entered arrival for irradiation date.
04. Aug 2017 03:14:57 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:13:08 CEST Tobias Imported from Hamamatsu datasheet.