RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0711006293 - Archived data from Fri, 05. February 2021 11:26:29 CET


This is all the information about APD 0711006293. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0711006293
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B12
Break-through voltage: 421 V
Voltage for Gain 100 (T=+25°C): 392.8 V
Dark current: 28.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 296
Position in Box: 24
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 46
Position in grid: 0
Arrival for irradiation: 03. Aug 2017
Sent for analysis after irradiation: 23. Aug 2017
Return for assembly: none
   
Irradiation:  
Date: 11. Aug 2017
Dose used: 46 Gy
Temperature: 20 °C
Position: 1
Bias voltage: 392.8 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 392.948946 V     T = -25 °C: 356.4524842 V
Voltage for Gain 150: T = +20 °C: 400.7878801 V     T = -25 °C: 364.0042283 V
Voltage for Gain 200: T = +20 °C: 405.1266969 V     T = -25 °C: 368.247146 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.626344806 V-1     T = -25 °C: 4.658921636 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.195229125 V-1     T = -25 °C: 9.239813441 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.39734943 V-1     T = -25 °C: 14.44081717 V-1
Break-through voltage: T = +20 °C: 420.1189993 V     T = -25 °C: 383.7292828 V
   
Notes:


Version history

Time Author Change comment
21. Apr 2021 14:48:05 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:26:29 CET jreher Updated box and position via API.
11. Aug 2020 17:56:32 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:41:57 CEST jreher Updated APD location via API.
21. Jul 2020 14:41:48 CEST jreher Updated box and position via API.
19. Dec 2019 15:47:38 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:17:21 CET jreher Updated box and position via API.
23. Aug 2017 15:54:04 CEST markus.moritz Entered shipped after irradiation date.
11. Aug 2017 14:10:09 CEST hans-georg.zaunick Entered irradiation information.
11. Aug 2017 12:58:49 CEST hans-georg.zaunick Entered irradiation information.
07. Aug 2017 16:52:30 CEST hans-georg.zaunick Entered arrival for irradiation date.
07. Aug 2017 16:42:40 CEST hans-georg.zaunick Entered arrival for irradiation date.
04. Aug 2017 03:14:55 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:13:08 CEST Tobias Imported from Hamamatsu datasheet.