RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1605017133 - Archived data from Thu, 02. November 2017 15:16:56 CET


This is all the information about APD 1605017133. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1605017133
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: unknown
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F11
Break-through voltage: 428 V
Voltage for Gain 100 (T=+25°C): 399 V
Dark current: 4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 301
Position in Box: 34
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 443
Position in grid: 14
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 150: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 200: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 100: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 150: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 200: T = +20 °C: none     T = -25 °C: none
Break-through voltage: T = +20 °C: none     T = -25 °C: none
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:27:09 CET jreher Updated box and position via API.
11. Aug 2020 17:57:23 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:43:01 CEST jreher Updated box and position via API.
19. Dec 2019 16:18:41 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:18:04 CET jreher Updated APD location via API.
19. Dec 2019 15:17:59 CET jreher Updated box and position via API.
17. Nov 2017 09:39:44 CET markus.moritz Entered shipped after irradiation date.
17. Nov 2017 09:37:49 CET markus.moritz Entered irradiation information.
09. Nov 2017 15:11:55 CET markus.moritz Entered arrival for irradiation date.
02. Nov 2017 15:16:56 CET Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:43:26 CEST Tobias Imported from Hamamatsu datasheet.