RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1604017040


This is all the information about APD 1604017040. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1604017040
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G05
Break-through voltage: 414 V
Voltage for Gain 100 (T=+25°C): 386.1 V
Dark current: 6.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 302
Position in Box: 1
EP1 batch: none
EP1 batch after irradiation: 10370
   
Shipment:  
Grid number: 439
Position in grid: 13
Arrival for irradiation: 30. Oct 2017
Sent for analysis after irradiation: 10. Nov 2017
Return for assembly: none
   
Irradiation:  
Date: 10. Nov 2017
Dose used: 45 Gy
Temperature: 20 °C
Position: 4
Bias voltage: 386.1 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 387.5204805 V     T = -25 °C: 351.3700634 V
Voltage for Gain 150: T = +20 °C: 395.4621615 V     T = -25 °C: 358.96613 V
Voltage for Gain 200: T = +20 °C: 399.8553862 V     T = -25 °C: 363.2705558 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.356150484 V-1     T = -25 °C: 4.547386708 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.445172697 V-1     T = -25 °C: 9.194946666 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.51400297 V-1     T = -25 °C: 13.95221891 V-1
Break-through voltage: T = +20 °C: 409.3198596 V     T = -25 °C: 378.0506506 V
   
Notes:


Characteristics

Temperature Measurement Notes
No characteristics available!


Upload new characteristic...

Progression of the current during irradiation

Upload time Notes
No data available!


Upload new progression data...

Version history

Time Author Change comment
21. Apr 2021 12:51:23 CEST jreher Updated box and position via API.
05. Feb 2021 11:27:13 CET jreher Updated box and position via API.
11. Aug 2020 17:57:26 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:43:23 CEST jreher Updated APD location via API.
21. Jul 2020 14:43:13 CEST jreher Updated box and position via API.
19. Dec 2019 16:18:42 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:18:05 CET jreher Updated box and position via API.
10. Nov 2017 09:39:43 CET markus.moritz Entered shipped after irradiation date.
10. Nov 2017 09:38:15 CET markus.moritz Entered irradiation information.
09. Nov 2017 15:11:44 CET markus.moritz Entered arrival for irradiation date.
02. Nov 2017 15:16:56 CET Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:42:24 CEST Tobias Imported from Hamamatsu datasheet.