Serial: 1604017034
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C04
Break-through voltage: 417 V
Voltage for Gain 100 (T=+25°C): 389.4 V
Dark current: 6.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 301
Position in Box: 45
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 439
Position in grid: 7
Arrival for irradiation: 30. Oct 2017
Sent for analysis after irradiation: 10. Nov 2017
Return for assembly: none
   
Irradiation:  
Date: 10. Nov 2017
Dose used: 45 Gy
Temperature: 20 °C
Position: 4
Bias voltage: 389.4 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 389.2575118 V     T = -25 °C: 354.2500182 V
Voltage for Gain 150: T = +20 °C: 397.2149143 V     T = -25 °C: 361.5462201 V
Voltage for Gain 200: T = +20 °C: 401.62881 V     T = -25 °C: 365.8125036 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.422140166 V-1     T = -25 °C: 4.205718255 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.608025608 V-1     T = -25 °C: 10.29934451 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.9420397 V-1     T = -25 °C: 15.74830166 V-1
Break-through voltage: T = +20 °C: 417.0131402 V     T = -25 °C: 381.229682 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:27:11 CET jreher Updated box and position via API.
11. Aug 2020 17:57:25 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:43:11 CEST jreher Updated APD location via API.
21. Jul 2020 14:43:02 CEST jreher Updated box and position via API.
19. Dec 2019 16:18:42 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:18:00 CET jreher Updated box and position via API.
10. Nov 2017 09:39:43 CET markus.moritz Entered shipped after irradiation date.
10. Nov 2017 09:38:15 CET markus.moritz Entered irradiation information.
09. Nov 2017 15:11:44 CET markus.moritz Entered arrival for irradiation date.
02. Nov 2017 15:16:56 CET Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:42:24 CEST Tobias Imported from Hamamatsu datasheet.