RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1604017017 - Archived data from Wed, 02. November 2016 14:32:34 CET


This is all the information about APD 1604017017. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1604017017
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: unknown
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C10
Break-through voltage: 424 V
Voltage for Gain 100 (T=+25°C): 395.2 V
Dark current: 6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: none
Position in Box: none
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 438
Position in grid: 11
Arrival for irradiation: 01. Oct 2016
Sent for analysis after irradiation: 02. Nov 2016
Return for assembly: none
   
Irradiation:  
Date: 17. Oct 2016
Dose used: 30 Gy
Temperature: 20 °C
Position: 1
Bias voltage: 350 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 150: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 200: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 100: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 150: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 200: T = +20 °C: none     T = -25 °C: none
Break-through voltage: T = +20 °C: none     T = -25 °C: none
   
Notes:


Version history

Time Author Change comment
17. Apr 2021 01:09:58 CEST jreher Updated APD location via API.
15. Nov 2016 11:26:50 CET markus.moritz Entered return for assembly date.
02. Nov 2016 14:32:34 CET markus.moritz Entered shipped after irradiation date.
20. Oct 2016 10:48:53 CEST markus.moritz Entered shipped after irradiation date.
20. Oct 2016 10:48:14 CEST markus.moritz Entered irradiation information.
13. Oct 2016 12:20:08 CEST markus.moritz Entered arrival for irradiation date.
04. Oct 2016 12:59:31 CEST Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:42:23 CEST Tobias Imported from Hamamatsu datasheet.