RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1603016930 - Archived data from Fri, 10. November 2017 09:39:35 CET


This is all the information about APD 1603016930. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1603016930
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: unknown
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G07
Break-through voltage: 414 V
Voltage for Gain 100 (T=+25°C): 387.6 V
Dark current: 6.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 302
Position in Box: 12
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 435
Position in grid: 6
Arrival for irradiation: 30. Oct 2017
Sent for analysis after irradiation: 10. Nov 2017
Return for assembly: none
   
Irradiation:  
Date: 10. Nov 2017
Dose used: 45 Gy
Temperature: 20 °C
Position: 3
Bias voltage: 387.6 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 150: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 200: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 100: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 150: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 200: T = +20 °C: none     T = -25 °C: none
Break-through voltage: T = +20 °C: none     T = -25 °C: none
   
Notes:


Version history

Time Author Change comment
26. Oct 2021 10:45:48 CEST oafedulidis Assigned to capsule by script
17. May 2021 09:15:50 CEST oafedulidis Updated box and position via API.
21. Apr 2021 12:51:24 CEST jreher Updated box and position via API.
05. Feb 2021 11:29:55 CET jreher Updated box and position via API.
05. Feb 2021 11:27:15 CET jreher Updated box and position via API.
11. Aug 2020 18:10:29 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:57:28 CEST jreher Updated APD characteristics via API.
21. Jul 2020 16:15:59 CEST jreher Updated APD batch assignment via API.
21. Jul 2020 14:43:24 CEST jreher Updated APD location via API.
21. Jul 2020 14:43:14 CEST jreher Updated box and position via API.
19. Dec 2019 16:18:43 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:18:05 CET jreher Updated box and position via API.
10. Nov 2017 09:39:35 CET markus.moritz Entered shipped after irradiation date.
10. Nov 2017 09:38:03 CET markus.moritz Entered irradiation information.
09. Nov 2017 15:11:38 CET markus.moritz Entered arrival for irradiation date.
02. Nov 2017 15:16:55 CET Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:42:21 CEST Tobias Imported from Hamamatsu datasheet.