RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1603016927 - Archived data from Fri, 05. February 2021 11:34:39 CET


This is all the information about APD 1603016927. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1603016927
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D07
Break-through voltage: 416 V
Voltage for Gain 100 (T=+25°C): 387.3 V
Dark current: 5.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 361
Position in Box: 47
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 393.5140447 V     T = -25 °C: 355.6114858 V
Voltage for Gain 150: T = +20 °C: 401.4282924 V     T = -25 °C: 362.7878094 V
Voltage for Gain 200: T = +20 °C: 405.8103798 V     T = -25 °C: 367.9248934 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.416076142 V-1     T = -25 °C: 1.696470686 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.633995361 V-1     T = -25 °C: 45.65987773 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.11285549 V-1     T = -25 °C: 21.01345071 V-1
Break-through voltage: T = +20 °C: 420.9673252 V     T = -25 °C: 384.4463371 V
   
Notes:


Version history

Time Author Change comment
16. Apr 2021 21:29:42 CEST jreher Updated APD characteristics via API.
05. Feb 2021 11:34:39 CET jreher Updated box and position via API.
05. Feb 2021 11:29:55 CET jreher Updated box and position via API.
08. Sep 2020 17:13:47 CEST vwerner Updated APD batch assignment via API.
11. Aug 2020 18:10:29 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:53:19 CEST jreher Updated APD location via API.
21. Jul 2020 16:15:59 CEST jreher Updated APD batch assignment via API.
09. Nov 2017 16:48:28 CET Tobias Removed APD from grid as the grid arrived in Gießen without it.
09. Nov 2017 15:11:38 CET markus.moritz Entered arrival for irradiation date.
02. Nov 2017 15:16:55 CET Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:42:21 CEST Tobias Imported from Hamamatsu datasheet.