Show Hamamatsu Avalanche Photo Diode 1603016925 - Archived data from Tue, 11. August 2020 18:10:28 CEST
This is all the information about APD 1603016925. If it is wrong, edit the data.
Subdetector specification: | |
---|---|
Serial: | 1603016925 |
Type: | Hamamatsu Avalanche Photo Diode |
Detector: | unassigned |
Unit: | unassigned |
Preamp: | 0 |
Current location: | Bochum |
Installation information: | |
Label: | none |
Manufacturer information: | |
Wafer position: | F08 |
Break-through voltage: | 418 V |
Voltage for Gain 100 (T=+25°C): | 389.7 V |
Dark current: | 6.5 nA |
Screening Logistics: | |
Available: | Yes |
Storage Box: | 302 |
Position in Box: | 8 |
EP1 batch: | none |
EP1 batch after irradiation: | none |
Shipment: | |
Grid number: | 435 |
Position in grid: | 1 |
Arrival for irradiation: | 30. Oct 2017 |
Sent for analysis after irradiation: | 10. Nov 2017 |
Return for assembly: | none |
Irradiation: | |
Date: | 10. Nov 2017 |
Dose used: | 45 Gy |
Temperature: | 20 °C |
Position: | 3 |
Bias voltage: | 389.7 V (connected) |
Annealing: | |
Date: | none |
Temperature: | none |
Duration: | none |
Measurement results: | |
Voltage for Gain 100: | T = +20 °C: 396.5857694 V T = -25 °C: 357.0834016 V |
Voltage for Gain 150: | T = +20 °C: 404.4715813 V T = -25 °C: 367.2749398 V |
Voltage for Gain 200: | T = +20 °C: 408.8365985 V T = -25 °C: 371.8904599 V |
Gain/Voltage slope at M = 100: | T = +20 °C: 4.383861855 V-1 T = -25 °C: 13.41845782 V-1 |
Gain/Voltage slope at M = 150: | T = +20 °C: 8.584960797 V-1 T = -25 °C: 13.09091217 V-1 |
Gain/Voltage slope at M = 200: | T = +20 °C: 14.90393072 V-1 T = -25 °C: 13.28633405 V-1 |
Break-through voltage: | T = +20 °C: 424.4734644 V T = -25 °C: 388.2040807 V |
Notes: |
Version history
Time | Author | Change comment |
---|---|---|
21. Apr 2021 12:51:23 CEST | jreher | Updated box and position via API. |
16. Apr 2021 21:29:41 CEST | jreher | Updated APD characteristics via API. |
05. Feb 2021 11:29:54 CET | jreher | Updated box and position via API. |
05. Feb 2021 11:27:14 CET | jreher | Updated box and position via API. |
11. Aug 2020 18:10:28 CEST | jreher | Updated APD characteristics via API. |
11. Aug 2020 17:57:27 CEST | jreher | Updated APD characteristics via API. |
21. Jul 2020 16:15:59 CEST | jreher | Updated APD batch assignment via API. |
21. Jul 2020 14:43:24 CEST | jreher | Updated APD location via API. |
21. Jul 2020 14:43:14 CEST | jreher | Updated box and position via API. |
19. Dec 2019 16:18:43 CET | spankonin | Updated APD batch assignment via API. |
19. Dec 2019 15:18:05 CET | jreher | Updated box and position via API. |
10. Nov 2017 09:39:35 CET | markus.moritz | Entered shipped after irradiation date. |
10. Nov 2017 09:38:03 CET | markus.moritz | Entered irradiation information. |
09. Nov 2017 15:11:38 CET | markus.moritz | Entered arrival for irradiation date. |
02. Nov 2017 15:16:55 CET | Tobias | Assigned to grid via information extracted from APD DB. |
23. Jun 2016 10:42:21 CEST | Tobias | Imported from Hamamatsu datasheet. |