RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1603016924 - Archived data from Fri, 05. February 2021 11:27:14 CET


This is all the information about APD 1603016924. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1603016924
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C08
Break-through voltage: 419 V
Voltage for Gain 100 (T=+25°C): 390.8 V
Dark current: 6.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 302
Position in Box: 7
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 435
Position in grid: 0
Arrival for irradiation: 30. Oct 2017
Sent for analysis after irradiation: 10. Nov 2017
Return for assembly: none
   
Irradiation:  
Date: 10. Nov 2017
Dose used: 45 Gy
Temperature: 20 °C
Position: 3
Bias voltage: 390.8 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 395.2227128 V     T = -25 °C: 354.299538 V
Voltage for Gain 150: T = +20 °C: 403.1092105 V     T = -25 °C: 362.9082412 V
Voltage for Gain 200: T = +20 °C: 407.4888042 V     T = -25 °C: 369.2881795 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.531081707 V-1     T = -25 °C: 30.47279307 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.96596316 V-1     T = -25 °C: 15.13225653 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.01765227 V-1     T = -25 °C: 27.79383074 V-1
Break-through voltage: T = +20 °C: 423.0756423 V     T = -25 °C: 386.6973035 V
   
Notes:


Version history

Time Author Change comment
21. Apr 2021 12:51:23 CEST jreher Updated box and position via API.
16. Apr 2021 21:29:41 CEST jreher Updated APD characteristics via API.
05. Feb 2021 11:29:54 CET jreher Updated box and position via API.
05. Feb 2021 11:27:14 CET jreher Updated box and position via API.
11. Aug 2020 18:10:28 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:57:27 CEST jreher Updated APD characteristics via API.
21. Jul 2020 16:15:59 CEST jreher Updated APD batch assignment via API.
21. Jul 2020 14:43:24 CEST jreher Updated APD location via API.
21. Jul 2020 14:43:14 CEST jreher Updated box and position via API.
19. Dec 2019 16:18:43 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:18:05 CET jreher Updated box and position via API.
10. Nov 2017 09:39:35 CET markus.moritz Entered shipped after irradiation date.
10. Nov 2017 09:38:03 CET markus.moritz Entered irradiation information.
09. Nov 2017 15:11:38 CET markus.moritz Entered arrival for irradiation date.
02. Nov 2017 15:16:55 CET Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:42:21 CEST Tobias Imported from Hamamatsu datasheet.