Show Hamamatsu Avalanche Photo Diode 1603016924 - Archived data from Fri, 05. February 2021 11:27:14 CET
This is all the information about APD 1603016924. If it is wrong, edit the data.
Subdetector specification: | |
---|---|
Serial: | 1603016924 |
Type: | Hamamatsu Avalanche Photo Diode |
Detector: | unassigned |
Unit: | unassigned |
Preamp: | 0 |
Current location: | Bochum |
Installation information: | |
Label: | none |
Manufacturer information: | |
Wafer position: | C08 |
Break-through voltage: | 419 V |
Voltage for Gain 100 (T=+25°C): | 390.8 V |
Dark current: | 6.2 nA |
Screening Logistics: | |
Available: | Yes |
Storage Box: | 302 |
Position in Box: | 7 |
EP1 batch: | none |
EP1 batch after irradiation: | none |
Shipment: | |
Grid number: | 435 |
Position in grid: | 0 |
Arrival for irradiation: | 30. Oct 2017 |
Sent for analysis after irradiation: | 10. Nov 2017 |
Return for assembly: | none |
Irradiation: | |
Date: | 10. Nov 2017 |
Dose used: | 45 Gy |
Temperature: | 20 °C |
Position: | 3 |
Bias voltage: | 390.8 V (connected) |
Annealing: | |
Date: | none |
Temperature: | none |
Duration: | none |
Measurement results: | |
Voltage for Gain 100: | T = +20 °C: 395.2227128 V T = -25 °C: 354.299538 V |
Voltage for Gain 150: | T = +20 °C: 403.1092105 V T = -25 °C: 362.9082412 V |
Voltage for Gain 200: | T = +20 °C: 407.4888042 V T = -25 °C: 369.2881795 V |
Gain/Voltage slope at M = 100: | T = +20 °C: 4.531081707 V-1 T = -25 °C: 30.47279307 V-1 |
Gain/Voltage slope at M = 150: | T = +20 °C: 8.96596316 V-1 T = -25 °C: 15.13225653 V-1 |
Gain/Voltage slope at M = 200: | T = +20 °C: 14.01765227 V-1 T = -25 °C: 27.79383074 V-1 |
Break-through voltage: | T = +20 °C: 423.0756423 V T = -25 °C: 386.6973035 V |
Notes: |
Version history
Time | Author | Change comment |
---|---|---|
21. Apr 2021 12:51:23 CEST | jreher | Updated box and position via API. |
16. Apr 2021 21:29:41 CEST | jreher | Updated APD characteristics via API. |
05. Feb 2021 11:29:54 CET | jreher | Updated box and position via API. |
05. Feb 2021 11:27:14 CET | jreher | Updated box and position via API. |
11. Aug 2020 18:10:28 CEST | jreher | Updated APD characteristics via API. |
11. Aug 2020 17:57:27 CEST | jreher | Updated APD characteristics via API. |
21. Jul 2020 16:15:59 CEST | jreher | Updated APD batch assignment via API. |
21. Jul 2020 14:43:24 CEST | jreher | Updated APD location via API. |
21. Jul 2020 14:43:14 CEST | jreher | Updated box and position via API. |
19. Dec 2019 16:18:43 CET | spankonin | Updated APD batch assignment via API. |
19. Dec 2019 15:18:05 CET | jreher | Updated box and position via API. |
10. Nov 2017 09:39:35 CET | markus.moritz | Entered shipped after irradiation date. |
10. Nov 2017 09:38:03 CET | markus.moritz | Entered irradiation information. |
09. Nov 2017 15:11:38 CET | markus.moritz | Entered arrival for irradiation date. |
02. Nov 2017 15:16:55 CET | Tobias | Assigned to grid via information extracted from APD DB. |
23. Jun 2016 10:42:21 CEST | Tobias | Imported from Hamamatsu datasheet. |