RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1602016833 - Archived data from Tue, 11. August 2020 17:57:32 CEST


This is all the information about APD 1602016833. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1602016833
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B12
Break-through voltage: 425 V
Voltage for Gain 100 (T=+25°C): 396.5 V
Dark current: 5.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 302
Position in Box: 31
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 431
Position in grid: 12
Arrival for irradiation: 29. Sep 2017
Sent for analysis after irradiation: 20. Oct 2017
Return for assembly: none
   
Irradiation:  
Date: 20. Oct 2017
Dose used: 45 Gy
Temperature: 20 °C
Position: 4
Bias voltage: 396.5 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 396.8475352 V     T = -25 °C: 360.3133504 V
Voltage for Gain 150: T = +20 °C: 404.7435878 V     T = -25 °C: 368.0550775 V
Voltage for Gain 200: T = +20 °C: 409.1184661 V     T = -25 °C: 372.3904584 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.642349793 V-1     T = -25 °C: 4.600859071 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.207653993 V-1     T = -25 °C: 9.044154665 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.37352743 V-1     T = -25 °C: 14.07082737 V-1
Break-through voltage: T = +20 °C: 424.5986646 V     T = -25 °C: 388.3430105 V
   
Notes:


Version history

Time Author Change comment
21. Apr 2021 12:51:26 CEST jreher Updated box and position via API.
05. Feb 2021 11:27:18 CET jreher Updated box and position via API.
11. Aug 2020 17:57:32 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:43:26 CEST jreher Updated APD location via API.
21. Jul 2020 14:43:16 CEST jreher Updated box and position via API.
19. Dec 2019 16:19:03 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:18:07 CET jreher Updated box and position via API.
20. Oct 2017 14:32:01 CEST markus.moritz Entered shipped after irradiation date.
20. Oct 2017 09:52:13 CEST markus.moritz Entered irradiation information.
29. Sep 2017 11:31:43 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:29:55 CEST Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:42:19 CEST Tobias Imported from Hamamatsu datasheet.