RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1602016832 - Archived data from Tue, 11. August 2020 17:57:32 CEST


This is all the information about APD 1602016832. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1602016832
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E09
Break-through voltage: 419 V
Voltage for Gain 100 (T=+25°C): 391 V
Dark current: 7.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 302
Position in Box: 30
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 431
Position in grid: 11
Arrival for irradiation: 29. Sep 2017
Sent for analysis after irradiation: 20. Oct 2017
Return for assembly: none
   
Irradiation:  
Date: 20. Oct 2017
Dose used: 45 Gy
Temperature: 20 °C
Position: 4
Bias voltage: 391 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 391.3490788 V     T = -25 °C: 354.8213703 V
Voltage for Gain 150: T = +20 °C: 399.2793394 V     T = -25 °C: 362.4626711 V
Voltage for Gain 200: T = +20 °C: 403.6740311 V     T = -25 °C: 366.7449348 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.436167473 V-1     T = -25 °C: 4.839449862 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.691492899 V-1     T = -25 °C: 8.785725684 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.11070631 V-1     T = -25 °C: 15.33008798 V-1
Break-through voltage: T = +20 °C: 418.8182794 V     T = -25 °C: 382.0933302 V
   
Notes:


Version history

Time Author Change comment
26. Oct 2021 16:06:55 CEST oafedulidis Assigned to capsule by script
17. May 2021 09:16:06 CEST oafedulidis Updated box and position via API.
21. Apr 2021 12:51:26 CEST jreher Updated box and position via API.
05. Feb 2021 11:27:18 CET jreher Updated box and position via API.
11. Aug 2020 17:57:32 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:43:26 CEST jreher Updated APD location via API.
21. Jul 2020 14:43:16 CEST jreher Updated box and position via API.
19. Dec 2019 16:19:03 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:18:07 CET jreher Updated box and position via API.
20. Oct 2017 14:32:01 CEST markus.moritz Entered shipped after irradiation date.
20. Oct 2017 09:52:13 CEST markus.moritz Entered irradiation information.
29. Sep 2017 11:31:43 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:29:55 CEST Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:42:19 CEST Tobias Imported from Hamamatsu datasheet.