RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1602016831 - Archived data from Fri, 20. October 2017 09:52:13 CEST


This is all the information about APD 1602016831. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1602016831
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: unknown
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C10
Break-through voltage: 423 V
Voltage for Gain 100 (T=+25°C): 394.7 V
Dark current: 6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 361
Position in Box: 45
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 431
Position in grid: 10
Arrival for irradiation: 29. Sep 2017
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: 20. Oct 2017
Dose used: 45 Gy
Temperature: 20 °C
Position: 4
Bias voltage: 394.7 V     (not connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 150: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 200: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 100: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 150: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 200: T = +20 °C: none     T = -25 °C: none
Break-through voltage: T = +20 °C: none     T = -25 °C: none
   
Notes:


Version history

Time Author Change comment
16. Apr 2021 22:01:41 CEST jreher Updated APD characteristics via API.
05. Feb 2021 11:34:39 CET jreher Updated box and position via API.
08. Oct 2020 18:16:22 CEST jreher Updated APD location via API.
08. Sep 2020 17:13:47 CEST vwerner Updated APD batch assignment via API.
20. Oct 2017 14:32:01 CEST markus.moritz Entered shipped after irradiation date.
20. Oct 2017 09:52:13 CEST markus.moritz Entered irradiation information.
29. Sep 2017 11:31:43 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:29:54 CEST Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:42:19 CEST Tobias Imported from Hamamatsu datasheet.