RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1602016825


This is all the information about APD 1602016825. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1602016825
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 1602016825/0814008257
Unit: #3801 (barcode 1309040469)
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: F05
Break-through voltage: 418 V
Voltage for Gain 100 (T=+25°C): 389.1 V
Dark current: 6.2 nA
   
Screening Logistics:  
Available: No
Storage Box: 302
Position in Box: 28
EP1 batch: none
EP1 batch after irradiation: 10371
   
Shipment:  
Grid number: 431
Position in grid: 6
Arrival for irradiation: 29. Sep 2017
Sent for analysis after irradiation: 20. Oct 2017
Return for assembly: none
   
Irradiation:  
Date: 20. Oct 2017
Dose used: 45 Gy
Temperature: 20 °C
Position: 4
Bias voltage: 389.1 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 389.6908749 V     T = -25 °C: 353.4448847 V
Voltage for Gain 150: T = +20 °C: 397.6267291 V     T = -25 °C: 361.0839913 V
Voltage for Gain 200: T = +20 °C: 402.0162841 V     T = -25 °C: 365.387077 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.333457256 V-1     T = -25 °C: 4.652345073 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.444786563 V-1     T = -25 °C: 9.180766073 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.56526519 V-1     T = -25 °C: 14.23842847 V-1
Break-through voltage: T = +20 °C: 417.9374823 V     T = -25 °C: 381.4604283 V
   
Notes:


Characteristics

Temperature Measurement Notes
No characteristics available!


Upload new characteristic...

Progression of the current during irradiation

Upload time Notes
No data available!


Upload new progression data...

Version history

Time Author Change comment
15. Nov 2022 13:17:55 CET oafedulidis Assigned to capsule by script
21. Apr 2021 12:51:25 CEST jreher Updated box and position via API.
05. Feb 2021 11:27:17 CET jreher Updated box and position via API.
11. Aug 2020 17:57:31 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:43:25 CEST jreher Updated APD location via API.
21. Jul 2020 14:43:16 CEST jreher Updated box and position via API.
19. Dec 2019 16:19:03 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:18:07 CET jreher Updated box and position via API.
20. Oct 2017 14:32:01 CEST markus.moritz Entered shipped after irradiation date.
20. Oct 2017 09:52:13 CEST markus.moritz Entered irradiation information.
29. Sep 2017 11:31:43 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:29:54 CEST Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:42:19 CEST Tobias Imported from Hamamatsu datasheet.