RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1602016824 - Archived data from Mon, 10. May 2021 14:00:44 CEST


This is all the information about APD 1602016824. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1602016824
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C02
Break-through voltage: 413 V
Voltage for Gain 100 (T=+25°C): 386.2 V
Dark current: 6.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 302
Position in Box: 27
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 431
Position in grid: 5
Arrival for irradiation: 29. Sep 2017
Sent for analysis after irradiation: 20. Oct 2017
Return for assembly: none
   
Irradiation:  
Date: 20. Oct 2017
Dose used: 45 Gy
Temperature: 20 °C
Position: 4
Bias voltage: 386.2 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 385.8320887 V     T = -25 °C: 350.2570732 V
Voltage for Gain 150: T = +20 °C: 393.8515157 V     T = -25 °C: 357.7889681 V
Voltage for Gain 200: T = +20 °C: 398.3027977 V     T = -25 °C: 361.993324 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.294784205 V-1     T = -25 °C: 4.782901591 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.071386979 V-1     T = -25 °C: 9.717809593 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.10234488 V-1     T = -25 °C: 15.46858406 V-1
Break-through voltage: T = +20 °C: 412.4679794 V     T = -25 °C: 376.5974519 V
   
Notes:


Version history

Time Author Change comment
19. May 2022 15:27:32 CEST oafedulidis Assigned to capsule by script
10. May 2021 14:00:44 CEST oafedulidis Updated box and position via API.
21. Apr 2021 12:51:25 CEST jreher Updated box and position via API.
05. Feb 2021 11:27:17 CET jreher Updated box and position via API.
11. Aug 2020 17:57:31 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:43:25 CEST jreher Updated APD location via API.
21. Jul 2020 14:43:15 CEST jreher Updated box and position via API.
19. Dec 2019 16:19:03 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:18:07 CET jreher Updated box and position via API.
20. Oct 2017 14:32:01 CEST markus.moritz Entered shipped after irradiation date.
20. Oct 2017 09:52:13 CEST markus.moritz Entered irradiation information.
29. Sep 2017 11:31:43 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:29:54 CEST Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:42:19 CEST Tobias Imported from Hamamatsu datasheet.