Show Hamamatsu Avalanche Photo Diode 1602016824 - Archived data from Tue, 11. August 2020 17:57:31 CEST
This is all the information about APD 1602016824. If it is wrong, edit the data.
Subdetector specification: | |
---|---|
Serial: | 1602016824 |
Type: | Hamamatsu Avalanche Photo Diode |
Detector: | unassigned |
Unit: | unassigned |
Preamp: | 0 |
Current location: | Bochum |
Installation information: | |
Label: | none |
Manufacturer information: | |
Wafer position: | C02 |
Break-through voltage: | 413 V |
Voltage for Gain 100 (T=+25°C): | 386.2 V |
Dark current: | 6.3 nA |
Screening Logistics: | |
Available: | Yes |
Storage Box: | 302 |
Position in Box: | 27 |
EP1 batch: | none |
EP1 batch after irradiation: | none |
Shipment: | |
Grid number: | 431 |
Position in grid: | 5 |
Arrival for irradiation: | 29. Sep 2017 |
Sent for analysis after irradiation: | 20. Oct 2017 |
Return for assembly: | none |
Irradiation: | |
Date: | 20. Oct 2017 |
Dose used: | 45 Gy |
Temperature: | 20 °C |
Position: | 4 |
Bias voltage: | 386.2 V (connected) |
Annealing: | |
Date: | none |
Temperature: | none |
Duration: | none |
Measurement results: | |
Voltage for Gain 100: | T = +20 °C: 385.8320887 V T = -25 °C: 350.2570732 V |
Voltage for Gain 150: | T = +20 °C: 393.8515157 V T = -25 °C: 357.7889681 V |
Voltage for Gain 200: | T = +20 °C: 398.3027977 V T = -25 °C: 361.993324 V |
Gain/Voltage slope at M = 100: | T = +20 °C: 4.294784205 V-1 T = -25 °C: 4.782901591 V-1 |
Gain/Voltage slope at M = 150: | T = +20 °C: 9.071386979 V-1 T = -25 °C: 9.717809593 V-1 |
Gain/Voltage slope at M = 200: | T = +20 °C: 14.10234488 V-1 T = -25 °C: 15.46858406 V-1 |
Break-through voltage: | T = +20 °C: 412.4679794 V T = -25 °C: 376.5974519 V |
Notes: |
Version history
Time | Author | Change comment |
---|---|---|
19. May 2022 15:27:32 CEST | oafedulidis | Assigned to capsule by script |
10. May 2021 14:00:44 CEST | oafedulidis | Updated box and position via API. |
21. Apr 2021 12:51:25 CEST | jreher | Updated box and position via API. |
05. Feb 2021 11:27:17 CET | jreher | Updated box and position via API. |
11. Aug 2020 17:57:31 CEST | jreher | Updated APD characteristics via API. |
21. Jul 2020 14:43:25 CEST | jreher | Updated APD location via API. |
21. Jul 2020 14:43:15 CEST | jreher | Updated box and position via API. |
19. Dec 2019 16:19:03 CET | spankonin | Updated APD batch assignment via API. |
19. Dec 2019 15:18:07 CET | jreher | Updated box and position via API. |
20. Oct 2017 14:32:01 CEST | markus.moritz | Entered shipped after irradiation date. |
20. Oct 2017 09:52:13 CEST | markus.moritz | Entered irradiation information. |
29. Sep 2017 11:31:43 CEST | markus.moritz | Entered arrival for irradiation date. |
01. Aug 2016 17:29:54 CEST | Tobias | Assigned to grid via information extracted from APD DB. |
23. Jun 2016 10:42:19 CEST | Tobias | Imported from Hamamatsu datasheet. |