Show Hamamatsu Avalanche Photo Diode 1602016818 - Archived data from Tue, 11. August 2020 17:27:18 CEST
This is all the information about APD 1602016818. If it is wrong, edit the data.
Subdetector specification: | |
---|---|
Serial: | 1602016818 |
Type: | Hamamatsu Avalanche Photo Diode |
Detector: | unassigned |
Unit: | unassigned |
Preamp: | 0 |
Current location: | Bochum |
Installation information: | |
Label: | none |
Manufacturer information: | |
Wafer position: | B04 |
Break-through voltage: | 412 V |
Voltage for Gain 100 (T=+25°C): | 386.1 V |
Dark current: | 6.8 nA |
Screening Logistics: | |
Available: | Yes |
Storage Box: | 46 |
Position in Box: | 25 |
EP1 batch: | none |
EP1 batch after irradiation: | none |
Shipment: | |
Grid number: | 430 |
Position in grid: | 19 |
Arrival for irradiation: | 29. Sep 2017 |
Sent for analysis after irradiation: | 16. Jan 2019 |
Return for assembly: | none |
Irradiation: | |
Date: | 29. Nov 2018 |
Dose used: | 37 Gy |
Temperature: | 20 °C |
Position: | none |
Bias voltage: | none |
Annealing: | |
Date: | 30. Nov 2018 |
Temperature: | 80 °C |
Duration: | 48 h |
Measurement results: | |
Voltage for Gain 100: | T = +20 °C: 385.4979512 V T = -25 °C: 349.5624336 V |
Voltage for Gain 150: | T = +20 °C: 393.4441064 V T = -25 °C: 357.1634383 V |
Voltage for Gain 200: | T = +20 °C: 397.9076615 V T = -25 °C: 361.4604309 V |
Gain/Voltage slope at M = 100: | T = +20 °C: 4.489316054 V-1 T = -25 °C: 4.496352593 V-1 |
Gain/Voltage slope at M = 150: | T = +20 °C: 8.725009919 V-1 T = -25 °C: 9.321483077 V-1 |
Gain/Voltage slope at M = 200: | T = +20 °C: 14.89209259 V-1 T = -25 °C: 16.26653388 V-1 |
Break-through voltage: | T = +20 °C: 410.9347016 V T = -25 °C: 376.4458266 V |
Notes: |
Version history
Time | Author | Change comment |
---|---|---|
05. Feb 2021 10:54:09 CET | jreher | Updated box and position via API. |
03. Feb 2021 18:19:53 CET | jreher | Updated box and position via API. |
07. Oct 2020 15:46:09 CEST | jreher | Updated APD location via API. |
11. Aug 2020 17:27:18 CEST | jreher | Updated APD characteristics via API. |
27. Nov 2019 19:37:10 CET | jreher | Updated APD location via API. |
25. Nov 2019 17:14:33 CET | jreher | Updated box and position via API. |
04. Jul 2019 11:11:53 CEST | jreher | Updated APD location via API. |
18. Jun 2019 13:30:07 CEST | jgrochowski | Updated APD batch assignment via API. |
18. Jan 2019 14:43:29 CET | markus.moritz | |
03. Dec 2018 14:03:21 CET | markus.moritz | |
29. Sep 2017 12:32:45 CEST | markus.moritz | Entered arrival for irradiation date. |
01. Aug 2016 17:29:54 CEST | Tobias | Assigned to grid via information extracted from APD DB. |
23. Jun 2016 10:42:19 CEST | Tobias | Imported from Hamamatsu datasheet. |