RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1602016811 - Archived data from Tue, 11. August 2020 17:27:11 CEST


This is all the information about APD 1602016811. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1602016811
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D03
Break-through voltage: 418 V
Voltage for Gain 100 (T=+25°C): 389.3 V
Dark current: 6.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 46
Position in Box: 18
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 430
Position in grid: 12
Arrival for irradiation: 29. Sep 2017
Sent for analysis after irradiation: 16. Jan 2019
Return for assembly: none
   
Irradiation:  
Date: 29. Nov 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 30. Nov 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 389.8102247 V     T = -25 °C: 353.4248418 V
Voltage for Gain 150: T = +20 °C: 397.816395 V     T = -25 °C: 361.1156971 V
Voltage for Gain 200: T = +20 °C: 402.2578295 V     T = -25 °C: 365.4835639 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.295195895 V-1     T = -25 °C: 4.836043844 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.544698815 V-1     T = -25 °C: 9.093367165 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.65396579 V-1     T = -25 °C: 15.07721912 V-1
Break-through voltage: T = +20 °C: 417.9832479 V     T = -25 °C: 381.4300161 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:54:07 CET jreher Updated box and position via API.
03. Feb 2021 18:19:52 CET jreher Updated box and position via API.
07. Oct 2020 15:46:08 CEST jreher Updated APD location via API.
11. Aug 2020 17:27:11 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:37:09 CET jreher Updated APD location via API.
25. Nov 2019 17:14:33 CET jreher Updated box and position via API.
04. Jul 2019 11:11:52 CEST jreher Updated APD location via API.
18. Jun 2019 13:30:07 CEST jgrochowski Updated APD batch assignment via API.
18. Jan 2019 14:42:31 CET markus.moritz
03. Dec 2018 14:17:03 CET markus.moritz
29. Sep 2017 12:32:45 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:29:54 CEST Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:42:19 CEST Tobias Imported from Hamamatsu datasheet.