RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1601016784 - Archived data from Tue, 11. August 2020 17:25:20 CEST


This is all the information about APD 1601016784. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1601016784
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D13
Break-through voltage: 426 V
Voltage for Gain 100 (T=+25°C): 397 V
Dark current: 5.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 35
Position in Box: 9
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 428
Position in grid: 5
Arrival for irradiation: 29. Sep 2017
Sent for analysis after irradiation: 26. Nov 2018
Return for assembly: none
   
Irradiation:  
Date: 22. Nov 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: 0 V     (connected)
   
Annealing:  
Date: 23. Nov 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 397.5082256 V     T = -25 °C: 360.7722261 V
Voltage for Gain 150: T = +20 °C: 405.4964266 V     T = -25 °C: 368.6206834 V
Voltage for Gain 200: T = +20 °C: 409.9328262 V     T = -25 °C: 373.0301351 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.565374258 V-1     T = -25 °C: 4.460703407 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.451102284 V-1     T = -25 °C: 8.962837789 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.80791837 V-1     T = -25 °C: 14.07617098 V-1
Break-through voltage: T = +20 °C: 425.7514255 V     T = -25 °C: 388.8614265 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:52:24 CET jreher Updated box and position via API.
03. Feb 2021 18:18:27 CET jreher Updated box and position via API.
07. Oct 2020 15:45:55 CEST jreher Updated APD location via API.
11. Aug 2020 17:25:20 CEST jreher Updated APD characteristics via API.
28. Nov 2019 12:22:48 CET jreher Updated APD location via API.
25. Nov 2019 17:13:37 CET jreher Updated box and position via API.
13. Jun 2019 11:29:28 CEST jreher Updated APD location via API.
12. Jun 2019 16:47:59 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:32:55 CEST jreher Updated APD batch assignment via API.
26. Nov 2018 15:09:36 CET markus.moritz
29. Sep 2017 13:46:17 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:29:52 CEST Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:42:18 CEST Tobias Imported from Hamamatsu datasheet.