RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1601016752 - Archived data from Wed, 03. February 2021 18:18:26 CET


This is all the information about APD 1601016752. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1601016752
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: In transit to Mainz
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D06
Break-through voltage: 416 V
Voltage for Gain 100 (T=+25°C): 387.5 V
Dark current: 6.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 35
Position in Box: 2
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 426
Position in grid: 16
Arrival for irradiation: 29. Sep 2017
Sent for analysis after irradiation: 16. Jan 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Nov 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 30. Nov 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 388.3292227 V     T = -25 °C: 351.9266445 V
Voltage for Gain 150: T = +20 °C: 396.2777517 V     T = -25 °C: 359.5502875 V
Voltage for Gain 200: T = +20 °C: 400.7001897 V     T = -25 °C: 363.8256787 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.370678842 V-1     T = -25 °C: 4.635159695 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.924379894 V-1     T = -25 °C: 9.631646573 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.05322713 V-1     T = -25 °C: 15.35858134 V-1
Break-through voltage: T = +20 °C: 416.1571763 V     T = -25 °C: 379.1211977 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:52:22 CET jreher Updated box and position via API.
03. Feb 2021 18:18:26 CET jreher Updated box and position via API.
07. Oct 2020 15:45:54 CEST jreher Updated APD location via API.
11. Aug 2020 17:25:19 CEST jreher Updated APD characteristics via API.
28. Nov 2019 12:22:47 CET jreher Updated APD location via API.
25. Nov 2019 17:13:36 CET jreher Updated box and position via API.
13. Jun 2019 11:29:27 CEST jreher Updated APD location via API.
12. Jun 2019 16:47:59 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:32:54 CEST jreher Updated APD batch assignment via API.
18. Jan 2019 14:39:18 CET markus.moritz
03. Dec 2018 13:57:10 CET markus.moritz
29. Sep 2017 11:42:47 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:29:51 CEST Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:42:17 CEST Tobias Imported from Hamamatsu datasheet.