RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0710006254 - Archived data from Tue, 11. August 2020 17:40:25 CEST


This is all the information about APD 0710006254. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0710006254
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F04
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 378.1 V
Dark current: 16.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 290
Position in Box: 38
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 44
Position in grid: 12
Arrival for irradiation: 20. Jun 2016
Sent for analysis after irradiation: 08. Jul 2016
Return for assembly: 04. Aug 2016
   
Irradiation:  
Date: 30. Jun 2016
Dose used: 30 Gy
Temperature: 25 °C
Position: 1
Bias voltage: 320 V     (connection unknown)
   
Annealing:  
Date: 01. Jul 2016
Temperature: 80 °C
Duration: 8 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 378.3415728 V     T = -25 °C: 343.03924 V
Voltage for Gain 150: T = +20 °C: 386.12963 V     T = -25 °C: 350.3036315 V
Voltage for Gain 200: T = +20 °C: 390.4715968 V     T = -25 °C: 354.3920845 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.530732966 V-1     T = -25 °C: 5.020792595 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.943862388 V-1     T = -25 °C: 9.343237529 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.7313867 V-1     T = -25 °C: 14.75849213 V-1
Break-through voltage: T = +20 °C: 405.828969 V     T = -25 °C: 369.3946403 V
   
Notes:


Version history

Time Author Change comment
16. May 2022 13:33:12 CEST oafedulidis Updated box and position via API.
28. Apr 2021 13:29:35 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:25:44 CET jreher Updated box and position via API.
11. Aug 2020 17:40:25 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:40:42 CEST jreher Updated box and position via API.
27. Nov 2019 20:18:51 CET jreher Updated APD location via API.
25. Nov 2019 17:31:29 CET jreher Updated box and position via API.
22. Oct 2019 14:32:00 CEST spankonin Updated APD location via API.
15. Oct 2019 11:02:53 CEST jgrochowski Updated APD batch assignment via API.
04. Aug 2016 13:23:04 CEST markus.moritz Entered return for assembly date.
03. Aug 2016 15:58:02 CEST markus.moritz Entered shipped after irradiation date.
03. Aug 2016 15:57:46 CEST markus.moritz Entered arrival for irradiation date.
02. Aug 2016 14:53:28 CEST christopher.l.hahn Entered annealing information.
02. Aug 2016 13:55:50 CEST markus.moritz Entered irradiation information.
01. Aug 2016 17:27:46 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:13:07 CEST Tobias Imported from Hamamatsu datasheet.