RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1503016699 - Archived data from Tue, 11. August 2020 17:26:06 CEST


This is all the information about APD 1503016699. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1503016699
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: A07
Break-through voltage: 417 V
Voltage for Gain 100 (T=+25°C): 389.8 V
Dark current: 3.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 39
Position in Box: 40
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 424
Position in grid: 12
Arrival for irradiation: 29. Sep 2017
Sent for analysis after irradiation: 16. Jan 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Nov 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 30. Nov 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 389.9758415 V     T = -25 °C: 353.5546802 V
Voltage for Gain 150: T = +20 °C: 397.9443223 V     T = -25 °C: 361.2161033 V
Voltage for Gain 200: T = +20 °C: 402.3682293 V     T = -25 °C: 365.5505475 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.404012661 V-1     T = -25 °C: 4.743764984 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.181761947 V-1     T = -25 °C: 9.209711157 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.90891231 V-1     T = -25 °C: 15.61530107 V-1
Break-through voltage: T = +20 °C: 416.6931602 V     T = -25 °C: 380.4669484 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:53:16 CET jreher Updated box and position via API.
03. Feb 2021 18:19:03 CET jreher Updated box and position via API.
11. Aug 2020 17:26:06 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:35:55 CET jreher Updated APD location via API.
25. Nov 2019 17:14:00 CET jreher Updated box and position via API.
04. Jul 2019 11:10:56 CEST jreher Updated APD location via API.
12. Jun 2019 16:48:20 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:33:17 CEST jreher Updated APD batch assignment via API.
18. Jan 2019 14:35:53 CET markus.moritz
03. Dec 2018 11:36:50 CET markus.moritz
29. Sep 2017 11:55:32 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:29:49 CEST Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:42:16 CEST Tobias Imported from Hamamatsu datasheet.