RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1503016689


This is all the information about APD 1503016689. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1503016689
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 1503016689/3103034050
Unit: #3118 (barcode 1309034109)
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: E01
Break-through voltage: 414 V
Voltage for Gain 100 (T=+25°C): 384.8 V
Dark current: 4.3 nA
   
Screening Logistics:  
Available: No
Storage Box: 39
Position in Box: 33
EP1 batch: none
EP1 batch after irradiation: 10064
   
Shipment:  
Grid number: 424
Position in grid: 5
Arrival for irradiation: 29. Sep 2017
Sent for analysis after irradiation: 16. Jan 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Nov 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 30. Nov 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 386.0826617 V     T = -25 °C: 349.9883622 V
Voltage for Gain 150: T = +20 °C: 394.1034472 V     T = -25 °C: 357.5448978 V
Voltage for Gain 200: T = +20 °C: 398.5632457 V     T = -25 °C: 361.8098622 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.372218082 V-1     T = -25 °C: 4.701282037 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.077544953 V-1     T = -25 °C: 9.14669034 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.74045054 V-1     T = -25 °C: 15.60021469 V-1
Break-through voltage: T = +20 °C: 412.9269192 V     T = -25 °C: 376.5907232 V
   
Notes:


Characteristics

Temperature Measurement Notes
No characteristics available!


Upload new characteristic...

Progression of the current during irradiation

Upload time Notes
No data available!


Upload new progression data...

Version history

Time Author Change comment
29. Mar 2022 12:38:41 CEST oafedulidis Assigned to capsule by script
16. Jun 2021 16:04:55 CEST oafedulidis Updated box and position via API.
16. Jun 2021 16:01:07 CEST oafedulidis Updated box and position via API.
16. Jun 2021 15:53:52 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:53:16 CET jreher Updated box and position via API.
03. Feb 2021 18:19:02 CET jreher Updated box and position via API.
11. Aug 2020 17:26:04 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:35:54 CET jreher Updated APD location via API.
25. Nov 2019 17:13:59 CET jreher Updated box and position via API.
04. Jul 2019 11:10:55 CEST jreher Updated APD location via API.
12. Jun 2019 16:48:20 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:33:16 CEST jreher Updated APD batch assignment via API.
18. Jan 2019 14:35:01 CET markus.moritz
03. Dec 2018 11:49:40 CET markus.moritz
29. Sep 2017 11:55:32 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:29:49 CEST Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:42:16 CEST Tobias Imported from Hamamatsu datasheet.