Show Hamamatsu Avalanche Photo Diode 1503016683 - Archived data from Wed, 03. February 2021 18:19:01 CET
This is all the information about APD 1503016683. If it is wrong, edit the data.
Subdetector specification: | |
---|---|
Serial: | 1503016683 |
Type: | Hamamatsu Avalanche Photo Diode |
Detector: | unassigned |
Unit: | unassigned |
Preamp: | 0 |
Current location: | Bochum |
Installation information: | |
Label: | none |
Manufacturer information: | |
Wafer position: | D08 |
Break-through voltage: | 417 V |
Voltage for Gain 100 (T=+25°C): | 388.3 V |
Dark current: | 4 nA |
Screening Logistics: | |
Available: | Yes |
Storage Box: | 39 |
Position in Box: | 29 |
EP1 batch: | none |
EP1 batch after irradiation: | none |
Shipment: | |
Grid number: | 424 |
Position in grid: | 1 |
Arrival for irradiation: | 29. Sep 2017 |
Sent for analysis after irradiation: | 16. Jan 2019 |
Return for assembly: | none |
Irradiation: | |
Date: | 28. Nov 2018 |
Dose used: | 37 Gy |
Temperature: | 20 °C |
Position: | none |
Bias voltage: | none |
Annealing: | |
Date: | 30. Nov 2018 |
Temperature: | 80 °C |
Duration: | 48 h |
Measurement results: | |
Voltage for Gain 100: | T = +20 °C: 389.095721 V T = -25 °C: 352.5364634 V |
Voltage for Gain 150: | T = +20 °C: 397.073411 V T = -25 °C: 360.1682566 V |
Voltage for Gain 200: | T = +20 °C: 401.5035155 V T = -25 °C: 364.4630403 V |
Gain/Voltage slope at M = 100: | T = +20 °C: 4.383700624 V-1 T = -25 °C: 4.810072079 V-1 |
Gain/Voltage slope at M = 150: | T = +20 °C: 9.164929543 V-1 T = -25 °C: 9.407441021 V-1 |
Gain/Voltage slope at M = 200: | T = +20 °C: 13.89971226 V-1 T = -25 °C: 14.36966967 V-1 |
Break-through voltage: | T = +20 °C: 416.9982423 V T = -25 °C: 380.1490987 V |
Notes: |
Version history
Time | Author | Change comment |
---|---|---|
05. Feb 2021 10:53:15 CET | jreher | Updated box and position via API. |
03. Feb 2021 18:19:01 CET | jreher | Updated box and position via API. |
11. Aug 2020 17:26:04 CEST | jreher | Updated APD characteristics via API. |
27. Nov 2019 19:35:54 CET | jreher | Updated APD location via API. |
25. Nov 2019 17:13:59 CET | jreher | Updated box and position via API. |
04. Jul 2019 11:10:55 CEST | jreher | Updated APD location via API. |
12. Jun 2019 16:48:20 CEST | jreher | Updated APD batch assignment via API. |
12. Jun 2019 16:33:16 CEST | jreher | Updated APD batch assignment via API. |
18. Jan 2019 14:34:23 CET | markus.moritz | |
03. Dec 2018 11:53:15 CET | markus.moritz | |
29. Sep 2017 11:55:32 CEST | markus.moritz | Entered arrival for irradiation date. |
01. Aug 2016 17:29:49 CEST | Tobias | Assigned to grid via information extracted from APD DB. |
23. Jun 2016 10:42:16 CEST | Tobias | Imported from Hamamatsu datasheet. |