RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0710006248 - Archived data from Thu, 04. August 2016 13:23:04 CEST


This is all the information about APD 0710006248. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0710006248
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: unknown
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F08
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 381.7 V
Dark current: 22.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 376
Position in Box: 29
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 44
Position in grid: 4
Arrival for irradiation: 20. Jun 2016
Sent for analysis after irradiation: 08. Jul 2016
Return for assembly: 04. Aug 2016
   
Irradiation:  
Date: 30. Jun 2016
Dose used: 30 Gy
Temperature: 25 °C
Position: 1
Bias voltage: 320 V     (connection unknown)
   
Annealing:  
Date: 01. Jul 2016
Temperature: 80 °C
Duration: 8 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 150: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 200: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 100: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 150: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 200: T = +20 °C: none     T = -25 °C: none
Break-through voltage: T = +20 °C: none     T = -25 °C: none
   
Notes:


Version history

Time Author Change comment
16. Apr 2021 22:02:50 CEST jreher Updated APD characteristics via API.
05. Feb 2021 11:36:35 CET jreher Updated box and position via API.
08. Oct 2020 18:19:15 CEST jreher Updated APD location via API.
04. Aug 2016 13:23:04 CEST markus.moritz Entered return for assembly date.
03. Aug 2016 15:58:02 CEST markus.moritz Entered shipped after irradiation date.
03. Aug 2016 15:57:46 CEST markus.moritz Entered arrival for irradiation date.
02. Aug 2016 14:53:28 CEST christopher.l.hahn Entered annealing information.
02. Aug 2016 13:55:50 CEST markus.moritz Entered irradiation information.
01. Aug 2016 17:27:46 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:13:07 CEST Tobias Imported from Hamamatsu datasheet.