RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1503016669 - Archived data from Fri, 05. February 2021 11:27:20 CET


This is all the information about APD 1503016669. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1503016669
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C10
Break-through voltage: 423 V
Voltage for Gain 100 (T=+25°C): 394.9 V
Dark current: 3.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 302
Position in Box: 50
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 429
Position in grid: 19
Arrival for irradiation: 29. Sep 2017
Sent for analysis after irradiation: 10. Nov 2017
Return for assembly: none
   
Irradiation:  
Date: 08. Nov 2017
Dose used: 45 Gy
Temperature: 20 °C
Position: 2
Bias voltage: 394.9 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 395.9486522 V     T = -25 °C: 359.5220013 V
Voltage for Gain 150: T = +20 °C: 403.8357038 V     T = -25 °C: 367.2479794 V
Voltage for Gain 200: T = +20 °C: 408.2069847 V     T = -25 °C: 371.5858377 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.603313247 V-1     T = -25 °C: 4.508140635 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.086367302 V-1     T = -25 °C: 8.755616202 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.12377396 V-1     T = -25 °C: 14.89956297 V-1
Break-through voltage: T = +20 °C: 425.2438937 V     T = -25 °C: 386.6618316 V
   
Notes:


Version history

Time Author Change comment
21. Apr 2021 12:51:28 CEST jreher Updated box and position via API.
05. Feb 2021 11:27:20 CET jreher Updated box and position via API.
11. Aug 2020 17:57:36 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:43:27 CEST jreher Updated APD location via API.
21. Jul 2020 14:43:17 CEST jreher Updated box and position via API.
19. Dec 2019 16:19:18 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:18:09 CET jreher Updated box and position via API.
10. Nov 2017 09:39:27 CET markus.moritz Entered shipped after irradiation date.
09. Nov 2017 15:01:38 CET markus.moritz Entered irradiation information.
29. Sep 2017 11:39:18 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:29:53 CEST Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:42:15 CEST Tobias Imported from Hamamatsu datasheet.