RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1503016654 - Archived data from Tue, 11. August 2020 17:57:34 CEST


This is all the information about APD 1503016654. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1503016654
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E12
Break-through voltage: 426 V
Voltage for Gain 100 (T=+25°C): 397.4 V
Dark current: 4.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 302
Position in Box: 40
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 429
Position in grid: 4
Arrival for irradiation: 29. Sep 2017
Sent for analysis after irradiation: 10. Nov 2017
Return for assembly: none
   
Irradiation:  
Date: 08. Nov 2017
Dose used: 45 Gy
Temperature: 20 °C
Position: 2
Bias voltage: 397.4 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 397.8871227 V     T = -25 °C: 361.6197358 V
Voltage for Gain 150: T = +20 °C: 405.7413363 V     T = -25 °C: 369.3135283 V
Voltage for Gain 200: T = +20 °C: 410.0842565 V     T = -25 °C: 373.5972471 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.633626307 V-1     T = -25 °C: 4.504179671 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.251219022 V-1     T = -25 °C: 8.832477243 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.48503645 V-1     T = -25 °C: 15.59966511 V-1
Break-through voltage: T = +20 °C: 425.5430631 V     T = -25 °C: 389.3726322 V
   
Notes:


Version history

Time Author Change comment
21. Apr 2021 12:51:27 CEST jreher Updated box and position via API.
05. Feb 2021 11:27:19 CET jreher Updated box and position via API.
11. Aug 2020 17:57:34 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:43:27 CEST jreher Updated APD location via API.
21. Jul 2020 14:43:16 CEST jreher Updated box and position via API.
19. Dec 2019 16:19:04 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:18:08 CET jreher Updated box and position via API.
10. Nov 2017 09:39:27 CET markus.moritz Entered shipped after irradiation date.
09. Nov 2017 15:01:38 CET markus.moritz Entered irradiation information.
29. Sep 2017 11:39:18 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:29:53 CEST Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:42:15 CEST Tobias Imported from Hamamatsu datasheet.