RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1502016633 - Archived data from Tue, 11. August 2020 17:25:10 CEST


This is all the information about APD 1502016633. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1502016633
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 1502016633/2415027155
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: D02
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 382.1 V
Dark current: 3.9 nA
   
Screening Logistics:  
Available: No
Storage Box: 34
Position in Box: 12
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 423
Position in grid: 11
Arrival for irradiation: 29. Sep 2017
Sent for analysis after irradiation: 03. Jan 2019
Return for assembly: none
   
Irradiation:  
Date: 05. Dec 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 10. Dec 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.5676593 V     T = -25 °C: 346.5999089 V
Voltage for Gain 150: T = +20 °C: 390.5214822 V     T = -25 °C: 354.0181561 V
Voltage for Gain 200: T = +20 °C: 394.9303709 V     T = -25 °C: 358.26051 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.426000802 V-1     T = -25 °C: 5.252050278 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.542629317 V-1     T = -25 °C: 9.302796682 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.28696419 V-1     T = -25 °C: 15.72311089 V-1
Break-through voltage: T = +20 °C: 409.8625839 V     T = -25 °C: 373.2655788 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:52:13 CET jreher Updated box and position via API.
03. Feb 2021 18:18:19 CET jreher Updated box and position via API.
11. Aug 2020 17:25:10 CEST jreher Updated APD characteristics via API.
27. Mar 2020 11:32:42 CET jreher Assigned to capsule by script
13. Feb 2020 15:25:41 CET jreher Updated box and position via API.
28. Nov 2019 12:22:36 CET jreher Updated APD location via API.
25. Nov 2019 17:13:32 CET jreher Updated box and position via API.
13. Jun 2019 11:29:14 CEST jreher Updated APD location via API.
12. Jun 2019 16:47:56 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:32:51 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 13:10:34 CET markus.moritz
29. Sep 2017 14:10:19 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:29:49 CEST Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:42:15 CEST Tobias Imported from Hamamatsu datasheet.