RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1502016570 - Archived data from Wed, 03. February 2021 18:17:51 CET


This is all the information about APD 1502016570. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1502016570
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 1602016816/1502016570
Unit: #866 (barcode 1309009497)
Preamp: 4414
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: A08
Break-through voltage: 415 V
Voltage for Gain 100 (T=+25°C): 388.3 V
Dark current: 4.5 nA
   
Screening Logistics:  
Available: No
Storage Box: 30
Position in Box: 47
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 420
Position in grid: 13
Arrival for irradiation: 29. Sep 2017
Sent for analysis after irradiation: 03. Jan 2019
Return for assembly: none
   
Irradiation:  
Date: 05. Dec 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 10. Dec 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 387.7811018 V     T = -25 °C: 351.7076743 V
Voltage for Gain 150: T = +20 °C: 395.7391634 V     T = -25 °C: 359.3292436 V
Voltage for Gain 200: T = +20 °C: 400.1533842 V     T = -25 °C: 363.627878 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.461132134 V-1     T = -25 °C: 4.730763688 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.565995038 V-1     T = -25 °C: 9.198534416 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.32923708 V-1     T = -25 °C: 15.60695861 V-1
Break-through voltage: T = +20 °C: 413.9229396 V     T = -25 °C: 378.4799013 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:51:46 CET jreher Updated box and position via API.
03. Feb 2021 18:17:51 CET jreher Updated box and position via API.
11. Aug 2020 17:24:38 CEST jreher Updated APD characteristics via API.
13. Feb 2020 14:42:52 CET jreher Updated box and position via API.
28. Nov 2019 12:21:53 CET jreher Updated APD location via API.
25. Nov 2019 17:13:16 CET jreher Updated box and position via API.
17. Oct 2019 14:11:15 CEST tholtmann Assigned to unit by script
17. Oct 2019 13:58:08 CEST tholtmann Assigned to capsule by script
13. Jun 2019 11:19:40 CEST jreher Updated APD location via API.
13. Jun 2019 11:19:04 CEST jreher Updated APD location via API.
12. Jun 2019 16:47:40 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:32:35 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 14:17:54 CET markus.moritz
29. Sep 2017 14:10:02 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:29:44 CEST Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:41:03 CEST Tobias Imported from Hamamatsu datasheet.