RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1502016563 - Archived data from Tue, 11. August 2020 17:24:37 CEST


This is all the information about APD 1502016563. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1502016563
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D14
Break-through voltage: 425 V
Voltage for Gain 100 (T=+25°C): 396.6 V
Dark current: 3.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 30
Position in Box: 42
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 420
Position in grid: 8
Arrival for irradiation: 29. Sep 2017
Sent for analysis after irradiation: 03. Jan 2019
Return for assembly: none
   
Irradiation:  
Date: 05. Dec 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 10. Dec 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 397.2980763 V     T = -25 °C: 360.4349731 V
Voltage for Gain 150: T = +20 °C: 405.2713653 V     T = -25 °C: 368.2399646 V
Voltage for Gain 200: T = +20 °C: 409.7139563 V     T = -25 °C: 372.6347258 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.609759476 V-1     T = -25 °C: 4.697954697 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.835511938 V-1     T = -25 °C: 9.012280469 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.89072376 V-1     T = -25 °C: 15.18255413 V-1
Break-through voltage: T = +20 °C: 425.0017789 V     T = -25 °C: 388.4130982 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:51:45 CET jreher Updated box and position via API.
03. Feb 2021 18:17:51 CET jreher Updated box and position via API.
11. Aug 2020 17:24:37 CEST jreher Updated APD characteristics via API.
28. Nov 2019 12:21:53 CET jreher Updated APD location via API.
25. Nov 2019 17:13:16 CET jreher Updated box and position via API.
13. Jun 2019 11:19:40 CEST jreher Updated APD location via API.
13. Jun 2019 11:19:03 CEST jreher Updated APD location via API.
12. Jun 2019 16:47:40 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:32:35 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 14:16:35 CET markus.moritz
29. Sep 2017 14:10:01 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:29:44 CEST Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:41:03 CEST Tobias Imported from Hamamatsu datasheet.