RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1501016502 - Archived data from Thu, 16. December 2021 13:41:15 CET


This is all the information about APD 1501016502. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1501016502
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B06
Break-through voltage: 422 V
Voltage for Gain 100 (T=+25°C): 393.9 V
Dark current: 3.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 34
Position in Box: 7
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 417
Position in grid: 16
Arrival for irradiation: 29. Sep 2017
Sent for analysis after irradiation: 26. Nov 2018
Return for assembly: none
   
Irradiation:  
Date: 22. Nov 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 23. Nov 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 394.1557697 V     T = -25 °C: 357.5849884 V
Voltage for Gain 150: T = +20 °C: 402.0951697 V     T = -25 °C: 365.2551848 V
Voltage for Gain 200: T = +20 °C: 406.5018117 V     T = -25 °C: 369.5564387 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.479063126 V-1     T = -25 °C: 4.415563243 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.60897592 V-1     T = -25 °C: 8.784757508 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.3385808 V-1     T = -25 °C: 15.56448437 V-1
Break-through voltage: T = +20 °C: 421.3625077 V     T = -25 °C: 385.0024559 V
   
Notes:


Version history

Time Author Change comment
15. Nov 2022 13:16:53 CET oafedulidis Assigned to capsule by script
16. Dec 2021 13:41:15 CET oafedulidis Updated box and position via API.
05. Feb 2021 10:52:13 CET jreher Updated box and position via API.
03. Feb 2021 18:18:19 CET jreher Updated box and position via API.
11. Aug 2020 17:25:10 CEST jreher Updated APD characteristics via API.
28. Nov 2019 12:22:36 CET jreher Updated APD location via API.
25. Nov 2019 17:13:32 CET jreher Updated box and position via API.
13. Jun 2019 11:29:14 CEST jreher Updated APD location via API.
12. Jun 2019 16:47:55 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:32:50 CEST jreher Updated APD batch assignment via API.
26. Nov 2018 15:06:10 CET markus.moritz
29. Sep 2017 13:46:42 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:29:42 CEST Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:41:01 CEST Tobias Imported from Hamamatsu datasheet.