RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1501016498 - Archived data from Wed, 03. February 2021 18:18:18 CET


This is all the information about APD 1501016498. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1501016498
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G13
Break-through voltage: 425 V
Voltage for Gain 100 (T=+25°C): 399.3 V
Dark current: 3.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 34
Position in Box: 4
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 417
Position in grid: 12
Arrival for irradiation: 29. Sep 2017
Sent for analysis after irradiation: 26. Nov 2018
Return for assembly: none
   
Irradiation:  
Date: 22. Nov 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 23. Nov 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 399.447508 V     T = -25 °C: 362.7064984 V
Voltage for Gain 150: T = +20 °C: 407.4052975 V     T = -25 °C: 370.5040089 V
Voltage for Gain 200: T = +20 °C: 411.7827636 V     T = -25 °C: 374.8458002 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.332183604 V-1     T = -25 °C: 4.541790119 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.546262387 V-1     T = -25 °C: 9.646839597 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.86178282 V-1     T = -25 °C: 14.8682411 V-1
Break-through voltage: T = +20 °C: 426.5883368 V     T = -25 °C: 390.4283013 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:52:12 CET jreher Updated box and position via API.
03. Feb 2021 18:18:18 CET jreher Updated box and position via API.
11. Aug 2020 17:25:09 CEST jreher Updated APD characteristics via API.
28. Nov 2019 12:22:36 CET jreher Updated APD location via API.
25. Nov 2019 17:13:32 CET jreher Updated box and position via API.
13. Jun 2019 11:29:14 CEST jreher Updated APD location via API.
12. Jun 2019 16:47:55 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:32:50 CEST jreher Updated APD batch assignment via API.
26. Nov 2018 15:07:02 CET markus.moritz
29. Sep 2017 13:46:42 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:29:42 CEST Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:41:01 CEST Tobias Imported from Hamamatsu datasheet.