RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1501016489 - Archived data from Tue, 11. August 2020 17:25:07 CEST


This is all the information about APD 1501016489. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1501016489
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 1501016489/1601016731
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: E08
Break-through voltage: 421 V
Voltage for Gain 100 (T=+25°C): 392.8 V
Dark current: 4.2 nA
   
Screening Logistics:  
Available: No
Storage Box: 33
Position in Box: 45
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 417
Position in grid: 3
Arrival for irradiation: 29. Sep 2017
Sent for analysis after irradiation: 26. Nov 2018
Return for assembly: none
   
Irradiation:  
Date: 22. Nov 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 23. Nov 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 392.7213968 V     T = -25 °C: 356.0769659 V
Voltage for Gain 150: T = +20 °C: 400.7312699 V     T = -25 °C: 363.7322588 V
Voltage for Gain 200: T = +20 °C: 405.1741402 V     T = -25 °C: 368.0306906 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.410183056 V-1     T = -25 °C: 4.557469983 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.373712352 V-1     T = -25 °C: 8.673863705 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.86434827 V-1     T = -25 °C: 14.47244249 V-1
Break-through voltage: T = +20 °C: 420.3581913 V     T = -25 °C: 383.2556554 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:52:09 CET jreher Updated box and position via API.
03. Feb 2021 18:18:15 CET jreher Updated box and position via API.
11. Aug 2020 17:25:07 CEST jreher Updated APD characteristics via API.
31. Mar 2020 08:49:36 CEST jreher Assigned to capsule by script
13. Feb 2020 15:11:36 CET jreher Updated box and position via API.
28. Nov 2019 12:22:28 CET jreher Updated APD location via API.
25. Nov 2019 17:13:30 CET jreher Updated box and position via API.
13. Jun 2019 11:29:04 CEST jreher Updated APD location via API.
12. Jun 2019 16:47:54 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:32:49 CEST jreher Updated APD batch assignment via API.
26. Nov 2018 15:03:41 CET markus.moritz
29. Sep 2017 13:46:42 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:29:42 CEST Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:41:01 CEST Tobias Imported from Hamamatsu datasheet.