RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1501016483 - Archived data from Mon, 03. December 2018 14:34:07 CET


This is all the information about APD 1501016483. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1501016483
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: unknown
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C08
Break-through voltage: 422 V
Voltage for Gain 100 (T=+25°C): 393.3 V
Dark current: 3.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 30
Position in Box: 32
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 416
Position in grid: 18
Arrival for irradiation: 29. Sep 2017
Sent for analysis after irradiation: 03. Dec 2018
Return for assembly: none
   
Irradiation:  
Date: 29. Nov 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 30. Nov 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 150: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 200: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 100: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 150: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 200: T = +20 °C: none     T = -25 °C: none
Break-through voltage: T = +20 °C: none     T = -25 °C: none
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:51:44 CET jreher Updated box and position via API.
03. Feb 2021 18:17:50 CET jreher Updated box and position via API.
11. Aug 2020 17:24:35 CEST jreher Updated APD characteristics via API.
28. Nov 2019 12:21:52 CET jreher Updated APD location via API.
25. Nov 2019 17:13:15 CET jreher Updated box and position via API.
13. Jun 2019 11:19:39 CEST jreher Updated APD location via API.
13. Jun 2019 11:19:02 CEST jreher Updated APD location via API.
12. Jun 2019 16:47:39 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:32:34 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 14:36:17 CET markus.moritz Entered shipped after irradiation date.
03. Dec 2018 14:34:07 CET markus.moritz
29. Sep 2017 12:30:55 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:29:41 CEST Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:41:00 CEST Tobias Imported from Hamamatsu datasheet.