RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1417016445 - Archived data from Wed, 07. October 2020 15:45:03 CEST


This is all the information about APD 1417016445. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1417016445
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: In transit to Mainz
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B12
Break-through voltage: 427 V
Voltage for Gain 100 (T=+25°C): 398.8 V
Dark current: 7.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 303
Position in Box: 28
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 415
Position in grid: 15
Arrival for irradiation: 29. Sep 2017
Sent for analysis after irradiation: 03. Nov 2017
Return for assembly: none
   
Irradiation:  
Date: 26. Oct 2017
Dose used: 45 Gy
Temperature: 20 °C
Position: 4
Bias voltage: 398.8 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 398.8713173 V     T = -25 °C: 362.4473268 V
Voltage for Gain 150: T = +20 °C: 406.8192974 V     T = -25 °C: 370.1641776 V
Voltage for Gain 200: T = +20 °C: 411.2254996 V     T = -25 °C: 374.4830836 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.572157399 V-1     T = -25 °C: 4.56015817 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.014747165 V-1     T = -25 °C: 8.893542005 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.0001923 V-1     T = -25 °C: 15.6099717 V-1
Break-through voltage: T = +20 °C: 427.1058265 V     T = -25 °C: 390.3757951 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:27:25 CET jreher Updated box and position via API.
07. Oct 2020 15:45:03 CEST jreher Updated APD location via API.
11. Aug 2020 17:57:42 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:43:41 CEST jreher Updated APD location via API.
21. Jul 2020 14:43:31 CEST jreher Updated box and position via API.
19. Dec 2019 16:19:39 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:18:14 CET jreher Updated box and position via API.
03. Nov 2017 16:13:19 CET markus.moritz Entered shipped after irradiation date.
26. Oct 2017 16:36:48 CEST markus.moritz Entered irradiation information.
29. Sep 2017 12:19:35 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:29:41 CEST Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:41:00 CEST Tobias Imported from Hamamatsu datasheet.