RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1417016406 - Archived data from Tue, 11. August 2020 17:25:58 CEST


This is all the information about APD 1417016406. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1417016406
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 1417016406/2710030812
Unit: #1157 (barcode 1309012602)
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: D06
Break-through voltage: 421 V
Voltage for Gain 100 (T=+25°C): 392.7 V
Dark current: 7.3 nA
   
Screening Logistics:  
Available: No
Storage Box: 38
Position in Box: 50
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 414
Position in grid: 0
Arrival for irradiation: 29. Sep 2017
Sent for analysis after irradiation: 16. Jan 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Nov 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 30. Nov 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 393.1668372 V     T = -25 °C: 356.4664425 V
Voltage for Gain 150: T = +20 °C: 401.1379835 V     T = -25 °C: 364.1405097 V
Voltage for Gain 200: T = +20 °C: 405.5333733 V     T = -25 °C: 368.3942314 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.356356576 V-1     T = -25 °C: 4.836999241 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.925774961 V-1     T = -25 °C: 9.020536753 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.03716437 V-1     T = -25 °C: 14.41096718 V-1
Break-through voltage: T = +20 °C: 421.0040523 V     T = -25 °C: 384.09428 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:53:10 CET jreher Updated box and position via API.
03. Feb 2021 18:18:54 CET jreher Updated box and position via API.
11. Aug 2020 17:25:58 CEST jreher Updated APD characteristics via API.
03. Apr 2020 10:01:30 CEST jreher Assigned to capsule by script
19. Feb 2020 11:53:11 CET jreher Updated box and position via API.
27. Nov 2019 19:35:44 CET jreher Updated APD location via API.
25. Nov 2019 17:13:56 CET jreher Updated box and position via API.
04. Jul 2019 11:10:48 CEST jreher Updated APD location via API.
12. Jun 2019 16:48:17 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:33:13 CEST jreher Updated APD batch assignment via API.
18. Jan 2019 14:33:23 CET markus.moritz Entered shipped after irradiation date.
03. Dec 2018 10:42:59 CET markus.moritz
29. Sep 2017 09:49:04 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:29:39 CEST Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:40:59 CEST Tobias Imported from Hamamatsu datasheet.