RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0710006223 - Archived data from Tue, 11. August 2020 17:44:02 CEST


This is all the information about APD 0710006223. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0710006223
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G12
Break-through voltage: 415 V
Voltage for Gain 100 (T=+25°C): 386.9 V
Dark current: 13.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 211
Position in Box: 24
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 386.7866968 V     T = -25 °C: 351.0142673 V
Voltage for Gain 150: T = +20 °C: 394.6502996 V     T = -25 °C: 358.4998067 V
Voltage for Gain 200: T = +20 °C: 399.0016566 V     T = -25 °C: 362.7023207 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.668244134 V-1     T = -25 °C: 4.833424953 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.324026601 V-1     T = -25 °C: 8.92252786 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.52970021 V-1     T = -25 °C: 15.57781647 V-1
Break-through voltage: T = +20 °C: 414.6819905 V     T = -25 °C: 378.4145063 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:15:31 CET jreher Updated box and position via API.
07. Oct 2020 12:18:07 CEST jreher Assigned to capsule by script
06. Oct 2020 16:51:25 CEST jreher Updated box and position via API.
11. Aug 2020 17:44:02 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:26:06 CEST jreher Updated box and position via API.
28. Nov 2019 13:32:24 CET spankonin Updated APD batch assignment via API.
28. Nov 2019 13:25:21 CET spankonin Updated APD batch assignment via API.
28. Nov 2019 12:50:42 CET spankonin Updated box and position via API.
27. Nov 2019 20:06:17 CET jreher Updated APD location via API.
25. Nov 2019 17:27:18 CET jreher Updated box and position via API.
25. Nov 2019 15:23:29 CET spankonin Updated APD batch assignment via API.
31. Oct 2019 16:57:51 CET spankonin Updated APD location via API.
22. Jun 2016 15:13:06 CEST Tobias Imported from Hamamatsu datasheet.