RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1416016318 - Archived data from Tue, 11. August 2020 18:04:05 CEST


This is all the information about APD 1416016318. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1416016318
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D07
Break-through voltage: 419 V
Voltage for Gain 100 (T=+25°C): 390.3 V
Dark current: 6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 285
Position in Box: 34
EP1 batch: 204
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 410
Position in grid: 6
Arrival for irradiation: 29. Sep 2017
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 390.504532 V     T = -25 °C: 354.1826769 V
Voltage for Gain 150: T = +20 °C: 398.4836775 V     T = -25 °C: 361.7676354 V
Voltage for Gain 200: T = +20 °C: 402.901324 V     T = -25 °C: 366.0242357 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.376055105 V-1     T = -25 °C: 4.743753056 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.474753499 V-1     T = -25 °C: 9.502987782 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.6027877 V-1     T = -25 °C: 14.86944948 V-1
Break-through voltage: T = +20 °C: 418.7473268 V     T = -25 °C: 381.9751862 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:25:07 CET jreher Updated box and position via API.
11. Aug 2020 18:04:05 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:39:53 CEST jreher Updated APD location via API.
21. Jul 2020 14:39:44 CEST jreher Updated box and position via API.
10. Feb 2020 18:57:09 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:50:16 CET jreher Updated APD location via API.
27. Nov 2019 20:18:00 CET jreher Updated APD location via API.
25. Nov 2019 17:31:06 CET jreher Updated box and position via API.
22. Oct 2019 13:10:55 CEST spankonin Updated APD location via API.
09. Oct 2019 11:47:44 CEST jgrochowski Updated APD batch assignment via API.
29. Sep 2017 12:26:44 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:29:37 CEST Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:40:56 CEST Tobias Imported from Hamamatsu datasheet.