RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1415016271 - Archived data from Wed, 07. October 2020 15:44:46 CEST


This is all the information about APD 1415016271. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1415016271
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: In transit to Mainz
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F07
Break-through voltage: 416 V
Voltage for Gain 100 (T=+25°C): 388.1 V
Dark current: 4.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 289
Position in Box: 1
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 409
Position in grid: 10
Arrival for irradiation: 29. Sep 2017
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: 22. Feb 2018
Dose used: 30 Gy
Temperature: 25 °C
Position: 2
Bias voltage: 0 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 388.1332097 V     T = -25 °C: 352.1086436 V
Voltage for Gain 150: T = +20 °C: 396.0543686 V     T = -25 °C: 359.6733724 V
Voltage for Gain 200: T = +20 °C: 400.4663025 V     T = -25 °C: 363.9144876 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.408077801 V-1     T = -25 °C: 4.773637396 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.820713376 V-1     T = -25 °C: 9.579253795 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.67139524 V-1     T = -25 °C: 14.98627061 V-1
Break-through voltage: T = +20 °C: 415.6479786 V     T = -25 °C: 379.7033109 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:25:32 CET jreher Updated box and position via API.
07. Oct 2020 15:44:46 CEST jreher Updated APD location via API.
11. Aug 2020 17:40:07 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:40:29 CEST jreher Updated box and position via API.
27. Nov 2019 20:18:37 CET jreher Updated APD location via API.
25. Nov 2019 17:31:22 CET jreher Updated box and position via API.
22. Oct 2019 14:31:13 CEST spankonin Updated APD location via API.
09. Oct 2019 11:30:27 CEST jgrochowski Updated APD batch assignment via API.
05. Apr 2018 12:28:22 CEST markus.moritz Entered irradiation information.
29. Sep 2017 14:09:35 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:29:36 CEST Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:40:56 CEST Tobias Imported from Hamamatsu datasheet.