RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1415016266 - Archived data from Wed, 07. October 2020 15:44:46 CEST


This is all the information about APD 1415016266. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1415016266
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: In transit to Mainz
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E07
Break-through voltage: 415 V
Voltage for Gain 100 (T=+25°C): 386.5 V
Dark current: 4.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 288
Position in Box: 47
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 409
Position in grid: 5
Arrival for irradiation: 29. Sep 2017
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: 22. Feb 2018
Dose used: 30 Gy
Temperature: 25 °C
Position: 2
Bias voltage: 0 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 386.7599722 V     T = -25 °C: 350.7867331 V
Voltage for Gain 150: T = +20 °C: 394.7445594 V     T = -25 °C: 358.3016518 V
Voltage for Gain 200: T = +20 °C: 399.1837778 V     T = -25 °C: 362.5208476 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.544386188 V-1     T = -25 °C: 4.908081452 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.997676197 V-1     T = -25 °C: 9.005611077 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.17842179 V-1     T = -25 °C: 15.85750866 V-1
Break-through voltage: T = +20 °C: 415.2396305 V     T = -25 °C: 378.4738116 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:25:30 CET jreher Updated box and position via API.
07. Oct 2020 15:44:46 CEST jreher Updated APD location via API.
11. Aug 2020 17:40:06 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:40:22 CEST jreher Updated box and position via API.
27. Nov 2019 20:18:30 CET jreher Updated APD location via API.
25. Nov 2019 17:31:21 CET jreher Updated box and position via API.
22. Oct 2019 14:30:40 CEST spankonin Updated APD location via API.
09. Oct 2019 11:30:27 CEST jgrochowski Updated APD batch assignment via API.
05. Apr 2018 12:28:22 CEST markus.moritz Entered irradiation information.
29. Sep 2017 14:09:34 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:29:36 CEST Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:40:56 CEST Tobias Imported from Hamamatsu datasheet.