RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0710006213 - Archived data from Wed, 07. October 2020 12:18:35 CEST


This is all the information about APD 0710006213. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0710006213
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 0710006213/1914021353
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: E14
Break-through voltage: 416 V
Voltage for Gain 100 (T=+25°C): 387.4 V
Dark current: 15.5 nA
   
Screening Logistics:  
Available: No
Storage Box: 211
Position in Box: 16
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 386.8003705 V     T = -25 °C: 350.881321 V
Voltage for Gain 150: T = +20 °C: 394.7613562 V     T = -25 °C: 358.3688708 V
Voltage for Gain 200: T = +20 °C: 399.1804567 V     T = -25 °C: 362.584347 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.605559935 V-1     T = -25 °C: 4.926883883 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.102058344 V-1     T = -25 °C: 8.977980814 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.08790342 V-1     T = -25 °C: 15.82533878 V-1
Break-through voltage: T = +20 °C: 415.0247694 V     T = -25 °C: 378.3441167 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:15:30 CET jreher Updated box and position via API.
07. Oct 2020 12:18:35 CEST jreher Assigned to capsule by script
17. Aug 2020 15:53:58 CEST jreher Updated box and position via API.
11. Aug 2020 17:43:56 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:26:05 CEST jreher Updated box and position via API.
28. Nov 2019 12:50:42 CET spankonin Updated box and position via API.
27. Nov 2019 20:06:16 CET jreher Updated APD location via API.
25. Nov 2019 17:27:17 CET jreher Updated box and position via API.
31. Oct 2019 17:09:41 CET spankonin Updated APD batch assignment via API.
31. Oct 2019 16:57:50 CET spankonin Updated APD location via API.
22. Jun 2016 15:13:06 CEST Tobias Imported from Hamamatsu datasheet.