RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1415016255 - Archived data from Tue, 11. August 2020 17:58:50 CEST


This is all the information about APD 1415016255. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1415016255
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D08
Break-through voltage: 415 V
Voltage for Gain 100 (T=+25°C): 386.7 V
Dark current: 5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 310
Position in Box: 20
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 408
Position in grid: 14
Arrival for irradiation: 29. Sep 2017
Sent for analysis after irradiation: 27. Oct 2017
Return for assembly: none
   
Irradiation:  
Date: 25. Oct 2017
Dose used: 45 Gy
Temperature: 20 °C
Position: 4
Bias voltage: 386.7 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 387.5888361 V     T = -25 °C: 351.8521071 V
Voltage for Gain 150: T = +20 °C: 395.5848142 V     T = -25 °C: 359.2936648 V
Voltage for Gain 200: T = +20 °C: 400.023252 V     T = -25 °C: 363.4730118 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.333619074 V-1     T = -25 °C: 4.947508514 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.153644094 V-1     T = -25 °C: 9.137404689 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.239018 V-1     T = -25 °C: 16.15428346 V-1
Break-through voltage: T = +20 °C: 415.1318867 V     T = -25 °C: 378.4825567 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:28:27 CET jreher Updated box and position via API.
11. Aug 2020 17:58:50 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:45:14 CEST jreher Updated box and position via API.
19. Dec 2019 16:48:20 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:19:14 CET jreher Updated APD location via API.
19. Dec 2019 15:19:08 CET jreher Updated box and position via API.
27. Oct 2017 10:38:33 CEST markus.moritz Entered shipped after irradiation date.
26. Oct 2017 16:28:27 CEST markus.moritz Entered irradiation information.
29. Sep 2017 14:22:21 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:29:47 CEST Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:40:55 CEST Tobias Imported from Hamamatsu datasheet.