RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1415016253 - Archived data from Mon, 17. May 2021 09:15:51 CEST


This is all the information about APD 1415016253. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1415016253
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C04
Break-through voltage: 417 V
Voltage for Gain 100 (T=+25°C): 388.9 V
Dark current: 6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 310
Position in Box: 18
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 408
Position in grid: 12
Arrival for irradiation: 29. Sep 2017
Sent for analysis after irradiation: 27. Oct 2017
Return for assembly: none
   
Irradiation:  
Date: 25. Oct 2017
Dose used: 45 Gy
Temperature: 20 °C
Position: 4
Bias voltage: 388.9 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 389.3916064 V     T = -25 °C: 353.2005779 V
Voltage for Gain 150: T = +20 °C: 397.311495 V     T = -25 °C: 360.7536318 V
Voltage for Gain 200: T = +20 °C: 401.7069789 V     T = -25 °C: 364.9842964 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.419835819 V-1     T = -25 °C: 4.717284824 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.630619641 V-1     T = -25 °C: 9.499496614 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.9748894 V-1     T = -25 °C: 14.89830442 V-1
Break-through voltage: T = +20 °C: 416.9940182 V     T = -25 °C: 380.5366311 V
   
Notes:


Version history

Time Author Change comment
26. Oct 2021 10:45:52 CEST oafedulidis Assigned to capsule by script
17. May 2021 09:15:51 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:28:27 CET jreher Updated box and position via API.
11. Aug 2020 17:58:50 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:45:24 CEST jreher Updated APD location via API.
21. Jul 2020 14:45:14 CEST jreher Updated box and position via API.
19. Dec 2019 16:48:20 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:19:08 CET jreher Updated box and position via API.
27. Oct 2017 10:38:33 CEST markus.moritz Entered shipped after irradiation date.
26. Oct 2017 16:28:27 CEST markus.moritz Entered irradiation information.
29. Sep 2017 14:22:21 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:29:47 CEST Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:40:55 CEST Tobias Imported from Hamamatsu datasheet.