RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1415016217 - Archived data from Tue, 11. August 2020 17:26:10 CEST


This is all the information about APD 1415016217. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1415016217
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G11
Break-through voltage: 419 V
Voltage for Gain 100 (T=+25°C): 390.9 V
Dark current: 5.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 40
Position in Box: 12
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 407
Position in grid: 1
Arrival for irradiation: 29. Sep 2017
Sent for analysis after irradiation: 26. Nov 2018
Return for assembly: none
   
Irradiation:  
Date: 22. Nov 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 23. Nov 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 391.6849536 V     T = -25 °C: 355.3313272 V
Voltage for Gain 150: T = +20 °C: 399.5795811 V     T = -25 °C: 362.9752877 V
Voltage for Gain 200: T = +20 °C: 403.9511455 V     T = -25 °C: 367.2769119 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.991043189 V-1     T = -25 °C: 4.482283891 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.290167954 V-1     T = -25 °C: 9.402854897 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.17904355 V-1     T = -25 °C: 15.58284915 V-1
Break-through voltage: T = +20 °C: 418.1364106 V     T = -25 °C: 382.8092079 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:53:21 CET jreher Updated box and position via API.
03. Feb 2021 18:19:07 CET jreher Updated box and position via API.
07. Oct 2020 14:22:39 CEST jreher Assigned to capsule by script
17. Aug 2020 15:53:52 CEST jreher Updated box and position via API.
11. Aug 2020 17:26:10 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:36:03 CET jreher Updated APD location via API.
25. Nov 2019 17:14:03 CET jreher Updated box and position via API.
04. Jul 2019 11:11:02 CEST jreher Updated APD location via API.
12. Jun 2019 16:48:23 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:33:19 CEST jreher Updated APD batch assignment via API.
26. Nov 2018 15:17:13 CET markus.moritz
29. Sep 2017 13:49:05 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:29:36 CEST Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:40:54 CEST Tobias Imported from Hamamatsu datasheet.