RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1415016209 - Archived data from Tue, 11. August 2020 17:26:10 CEST


This is all the information about APD 1415016209. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1415016209
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F04
Break-through voltage: 416 V
Voltage for Gain 100 (T=+25°C): 387.8 V
Dark current: 4.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 40
Position in Box: 9
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 406
Position in grid: 13
Arrival for irradiation: 29. Sep 2017
Sent for analysis after irradiation: 03. Jan 2019
Return for assembly: none
   
Irradiation:  
Date: 29. Nov 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 30. Nov 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 388.8276103 V     T = -25 °C: 352.6836233 V
Voltage for Gain 150: T = +20 °C: 396.719699 V     T = -25 °C: 360.2464907 V
Voltage for Gain 200: T = +20 °C: 401.0840196 V     T = -25 °C: 364.5269214 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.527592126 V-1     T = -25 °C: 4.746297784 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.611155321 V-1     T = -25 °C: 9.487912632 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.88413094 V-1     T = -25 °C: 15.88620171 V-1
Break-through voltage: T = +20 °C: 414.5904655 V     T = -25 °C: 379.5846356 V
   
Notes:


Version history

Time Author Change comment
10. Jun 2022 12:19:05 CEST oafedulidis Assigned to capsule by script
27. Aug 2021 11:15:34 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:53:20 CET jreher Updated box and position via API.
03. Feb 2021 18:19:07 CET jreher Updated box and position via API.
11. Aug 2020 17:26:10 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:36:03 CET jreher Updated APD location via API.
25. Nov 2019 17:14:02 CET jreher Updated box and position via API.
04. Jul 2019 11:11:01 CEST jreher Updated APD location via API.
12. Jun 2019 16:48:23 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:33:18 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 15:10:50 CET markus.moritz Entered shipped after irradiation date.
03. Dec 2018 14:42:35 CET markus.moritz
29. Sep 2017 12:27:36 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:29:35 CEST Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:40:54 CEST Tobias Imported from Hamamatsu datasheet.