RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0710006208 - Archived data from Tue, 11. August 2020 17:43:55 CEST


This is all the information about APD 0710006208. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0710006208
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: H09
Break-through voltage: 413 V
Voltage for Gain 100 (T=+25°C): 385.1 V
Dark current: 19.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 211
Position in Box: 11
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 385.4037813 V     T = -25 °C: 349.5007955 V
Voltage for Gain 150: T = +20 °C: 393.2327904 V     T = -25 °C: 356.9096996 V
Voltage for Gain 200: T = +20 °C: 397.5789357 V     T = -25 °C: 361.0908677 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.48074589 V-1     T = -25 °C: 4.706060432 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.788298006 V-1     T = -25 °C: 9.49473331 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.37089844 V-1     T = -25 °C: 14.93683093 V-1
Break-through voltage: T = +20 °C: 411.8614829 V     T = -25 °C: 375.853052 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:15:29 CET jreher Updated box and position via API.
08. Dec 2020 17:07:09 CET jreher Assigned to capsule by script
17. Aug 2020 16:01:00 CEST vwerner Updated box and position via API.
11. Aug 2020 17:43:55 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:26:05 CEST jreher Updated box and position via API.
28. Nov 2019 12:50:41 CET spankonin Updated box and position via API.
27. Nov 2019 20:06:16 CET jreher Updated APD location via API.
25. Nov 2019 17:27:17 CET jreher Updated box and position via API.
31. Oct 2019 17:09:41 CET spankonin Updated APD batch assignment via API.
31. Oct 2019 16:57:50 CET spankonin Updated APD location via API.
22. Jun 2016 15:13:06 CEST Tobias Imported from Hamamatsu datasheet.